[Show more]A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS 
b) An inaccurate load forecast 
 ...
Preview 2 out of 10 pages
Add to cartA Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS 
b) An inaccurate load forecast 
 ...
Common standard time period for station battery to handle outage of AC power to chargers 
8-12 hours 
 
 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 
2 hours 
 
 
 
Transition period to backup control facility (fully functioning) 
2 hours 
 
 ...
Preview 2 out of 9 pages
Add to cartCommon standard time period for station battery to handle outage of AC power to chargers 
8-12 hours 
 
 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 
2 hours 
 
 
 
Transition period to backup control facility (fully functioning) 
2 hours 
 
 ...
. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All au...
Preview 4 out of 55 pages
Add to cart. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All au...
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will in...
Preview 3 out of 24 pages
Add to cartA transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will in...
Frequency Bias and Jointly Owned Units (JOU) 
BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their bias setting. 
 
 
 
Frequency Bias and BA freq...
Preview 2 out of 14 pages
Add to cartFrequency Bias and Jointly Owned Units (JOU) 
BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their bias setting. 
 
 
 
Frequency Bias and BA freq...
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Sched...
Preview 4 out of 75 pages
Add to cartThe Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Sched...
What entity balances generation and monitors/employs contingency reserves? 
Balancing Authority (BA) 
 
 
 
What entity has the widest system view and is the "supervisor"? 
Reliability coordinator (RC) 
 
 
 
What entity monitors transmission lines and operates tap-changers, breakers, capacitors, ...
Preview 3 out of 21 pages
Add to cartWhat entity balances generation and monitors/employs contingency reserves? 
Balancing Authority (BA) 
 
 
 
What entity has the widest system view and is the "supervisor"? 
Reliability coordinator (RC) 
 
 
 
What entity monitors transmission lines and operates tap-changers, breakers, capacitors, ...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller JUICYGRADES. Stuvia facilitates payment to the seller.
No, you only buy these notes for $25.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
67418 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 15 years now