[Show more]Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? 
The front 
 
 
 
What is the definition of "operating radius?" 
The distance from the center of rotation of the crane to the center of gravity of the load 
 
 
 
What ap...
Preview 2 out of 5 pages
Add to cartWhich area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? 
The front 
 
 
 
What is the definition of "operating radius?" 
The distance from the center of rotation of the crane to the center of gravity of the load 
 
 
 
What ap...
Where is the best location for leveling a crane? 
Upperworks 
 
 
 
When determining the "gross load" the best method is: 
Get an accurate load weight and add the rigging. 
 
 
 
By order of hitch strength, which is the correct answer? 
Basket, vertical, choker 
 
 
 
What is the purpose of using ...
Preview 2 out of 5 pages
Add to cartWhere is the best location for leveling a crane? 
Upperworks 
 
 
 
When determining the "gross load" the best method is: 
Get an accurate load weight and add the rigging. 
 
 
 
By order of hitch strength, which is the correct answer? 
Basket, vertical, choker 
 
 
 
What is the purpose of using ...
A frequent inspection is: 
Daily to monthly 
 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
Boom Up 
(Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 
 
 
 
2. ...
Preview 2 out of 9 pages
Add to cartA frequent inspection is: 
Daily to monthly 
 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
Boom Up 
(Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 
 
 
 
2. ...
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom 
c. 
 
 
 
2. When hoisting personnel, within what percentage of level must a tele...
Preview 3 out of 17 pages
Add to cart1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom 
c. 
 
 
 
2. When hoisting personnel, within what percentage of level must a tele...
1x sold
Boom up 
What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
 
 
1% 
When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratin...
Preview 2 out of 5 pages
Add to cartBoom up 
What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
 
 
1% 
When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratin...
ancillary attachment 
devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
 
 
anti-two block device 
a device that prevents two blocking from occurring if crane is used with load hoist mechanism 
 
 
 
co...
Preview 2 out of 12 pages
Add to cartancillary attachment 
devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
 
 
anti-two block device 
a device that prevents two blocking from occurring if crane is used with load hoist mechanism 
 
 
 
co...
Timber or steel 
These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
 
 
Over the corner 
On crawler cranes, which boom position creates the greatest ground pressure 
 
 
 
Blocking 
Allows the weight of the crane and load to be dist...
Preview 2 out of 10 pages
Add to cartTimber or steel 
These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
 
 
Over the corner 
On crawler cranes, which boom position creates the greatest ground pressure 
 
 
 
Blocking 
Allows the weight of the crane and load to be dist...
ASME B30.5 
Mobile and Locomotive cranes, all types 
 
 
 
ASME B30.3 
Tower Cranes 
 
 
 
ASME B30.23 
Personel Lifting Regs 
 
 
 
OSHA 29 CFR 1926.1400 Series 
Cranes & Derrick's used in Construction regs. 
 
 
 
Rotation Resistant Wire Rope 
2 randomly broken wires in 6 diameters. 
 
4 randomly...
Preview 2 out of 13 pages
Add to cartASME B30.5 
Mobile and Locomotive cranes, all types 
 
 
 
ASME B30.3 
Tower Cranes 
 
 
 
ASME B30.23 
Personel Lifting Regs 
 
 
 
OSHA 29 CFR 1926.1400 Series 
Cranes & Derrick's used in Construction regs. 
 
 
 
Rotation Resistant Wire Rope 
2 randomly broken wires in 6 diameters. 
 
4 randomly...
When tower crane is erected/dismantled, written instructions must be correct answersOn site 
 
Tower crane erection/dismantling shall be performed under direct supervision of the correct answersDesignated person 
 
What is the minimum clearance from obstruction when the tower crane freely rotates 36...
Preview 1 out of 4 pages
Add to cartWhen tower crane is erected/dismantled, written instructions must be correct answersOn site 
 
Tower crane erection/dismantling shall be performed under direct supervision of the correct answersDesignated person 
 
What is the minimum clearance from obstruction when the tower crane freely rotates 36...
The crane is out of level, you release the swing break, the boom swings downhill, your: correct answersLoad radius increases 
 
Blocking can be placed under the ends of tracks to: correct answersIncrease the cranes stability when Operating over front or back 
 
What quadrant produces the least amoun...
Preview 2 out of 5 pages
Add to cartThe crane is out of level, you release the swing break, the boom swings downhill, your: correct answersLoad radius increases 
 
Blocking can be placed under the ends of tracks to: correct answersIncrease the cranes stability when Operating over front or back 
 
What quadrant produces the least amoun...
Before leveling a mobile crane on outriggers, an operator should ensure: correct answersthere is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? correct answersKeeping 90 degree angle between cyl...
Preview 2 out of 11 pages
Add to cartBefore leveling a mobile crane on outriggers, an operator should ensure: correct answersthere is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? correct answersKeeping 90 degree angle between cyl...
continuously correct answersduring all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements correct answersif the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a correct answersOSHA's s...
Preview 2 out of 7 pages
Add to cartcontinuously correct answersduring all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements correct answersif the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a correct answersOSHA's s...
Where is the best location for leveling a crane correct answersUpperworks 
 
When determining the "gross load " the best method is: correct answersGet an accurate load weight and add rigging 
 
By order of hitch strength, which is the correct Answer? correct answersBasket, vertical, chocker 
 
Wha...
Preview 2 out of 5 pages
Add to cartWhere is the best location for leveling a crane correct answersUpperworks 
 
When determining the "gross load " the best method is: correct answersGet an accurate load weight and add rigging 
 
By order of hitch strength, which is the correct Answer? correct answersBasket, vertical, chocker 
 
Wha...
What is the max included angle for a shackle? correct answers120 Degrees 
 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? correct answers80 % 
 
The center of gravity location of a load may _________of the load correct answersNot be located on the ac...
Preview 1 out of 3 pages
Add to cartWhat is the max included angle for a shackle? correct answers120 Degrees 
 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? correct answers80 % 
 
The center of gravity location of a load may _________of the load correct answersNot be located on the ac...
OSHA 1910 correct answersGeneral Industry Standards 
 
OSHA 1926 correct answersConstruction Industry Standards 
 
OSHA 1910.180 correct answersCrawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 correct answersSlings 
 
OSHA 1926.251 correct answersRigging Equipment used for material handling 
 
...
Preview 2 out of 5 pages
Add to cartOSHA 1910 correct answersGeneral Industry Standards 
 
OSHA 1926 correct answersConstruction Industry Standards 
 
OSHA 1910.180 correct answersCrawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 correct answersSlings 
 
OSHA 1926.251 correct answersRigging Equipment used for material handling 
 
...
1. A wire rope that is a 6x19 classification could have how many wires per strand? correct answers15 through 26 wires per strand 
 
2. How often should a synthetic web sling be inspected? correct answersEach day before use 
 
3. Which considerations should be given to suspend lifting operations with...
Preview 2 out of 6 pages
Add to cart1. A wire rope that is a 6x19 classification could have how many wires per strand? correct answers15 through 26 wires per strand 
 
2. How often should a synthetic web sling be inspected? correct answersEach day before use 
 
3. Which considerations should be given to suspend lifting operations with...
Splices in rall tracks shall have correct answersSmooth Joints 
 
Hydraulic systems should have their proper fluid level checked correct answersDaily 
 
If power fails during operations, the following shouldn't apply correct answersDo your best to finish moving load where it was designated to go 
 ...
Preview 2 out of 14 pages
Add to cartSplices in rall tracks shall have correct answersSmooth Joints 
 
Hydraulic systems should have their proper fluid level checked correct answersDaily 
 
If power fails during operations, the following shouldn't apply correct answersDo your best to finish moving load where it was designated to go 
 ...
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
...
Preview 2 out of 6 pages
Add to cartCrane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
...
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? correct answers2% 
 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is wo...
Preview 2 out of 6 pages
Add to cartThe lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? correct answers2% 
 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is wo...
According to OSHA, what clearance should a crane in transit keep while going under 
445KV lines? correct answers16 feet 
 
While operating a crane near 280KV powerlines, what distance does OSHA require you to 
keep? correct answers17 feet 8 inches 
 
When working around power lines you must: correct...
Preview 2 out of 5 pages
Add to cartAccording to OSHA, what clearance should a crane in transit keep while going under 
445KV lines? correct answers16 feet 
 
While operating a crane near 280KV powerlines, what distance does OSHA require you to 
keep? correct answers17 feet 8 inches 
 
When working around power lines you must: correct...
When hook-suspended personnel platforms are lifted with a telescopic boom crane, correct answersAn anti two-block devise must be provided 
 
When using a telescopic boom crane equipped with an anti two-block device, which hydraulic functions are disabled when the device is activated? correct answers...
Preview 1 out of 2 pages
Add to cartWhen hook-suspended personnel platforms are lifted with a telescopic boom crane, correct answersAn anti two-block devise must be provided 
 
When using a telescopic boom crane equipped with an anti two-block device, which hydraulic functions are disabled when the device is activated? correct answers...
Upperworks correct answersWhere is the best location for leveling a crane? 
 
When determining the gross load, the best method is: correct answersGet an accurate load weight and add the rigging 
 
By order of hitch strength, which is the correct answer? correct answersBasket, vertical, choker 
 
Wha...
Preview 1 out of 3 pages
Add to cartUpperworks correct answersWhere is the best location for leveling a crane? 
 
When determining the gross load, the best method is: correct answersGet an accurate load weight and add the rigging 
 
By order of hitch strength, which is the correct answer? correct answersBasket, vertical, choker 
 
Wha...
Which of the following OSHA regulations governs suspended personnel platforms correct answersOSHA 1926. 1431 
 
According to OSHA 1926.1408 the prohibited zone the powerlines that are 60 KV is correct answers15 ft 
 
What percentage of the gross capacity is used when lifting with more than one crane...
Preview 2 out of 7 pages
Add to cartWhich of the following OSHA regulations governs suspended personnel platforms correct answersOSHA 1926. 1431 
 
According to OSHA 1926.1408 the prohibited zone the powerlines that are 60 KV is correct answers15 ft 
 
What percentage of the gross capacity is used when lifting with more than one crane...
Jib offset is the jib angle to the: correct answersBoom 
 
All hazards and problems that are found on the worksite should be identified: correct answersAt the preoperational worksite inspection 
 
Which of the following OSHA regulations govern suspended personnel platforms: correct answersOSHA 1926....
Preview 2 out of 5 pages
Add to cartJib offset is the jib angle to the: correct answersBoom 
 
All hazards and problems that are found on the worksite should be identified: correct answersAt the preoperational worksite inspection 
 
Which of the following OSHA regulations govern suspended personnel platforms: correct answersOSHA 1926....
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller QUILLSKY. Stuvia facilitates payment to the seller.
No, you only buy these notes for $33.99. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
77254 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now