100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden
logo-home
NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+ 10,88 €   In den Einkaufswagen

Prüfung

NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+

 10 mal angesehen  1 mal verkauft
  • Kurs
  • Hochschule

NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+ Construction issues - -Transitory nature of workers Temporary nature of construction activities and the constantly changing workplace Time pressures from clients and principal contractors Weather conditions Levels of num...

[ Mehr anzeigen ]

vorschau 3 aus 27   Seiten

  • 13. juni 2023
  • 27
  • 2022/2023
  • Prüfung
  • Fragen & Antworten
avatar-seller
NEBOSH NCC1, Top Exam Questions
and answers, 100% Accurate. Graded A+

Construction issues - ✔✔-Transitory nature of workers

Temporary nature of construction activities and the constantly changing workplace

Time pressures from clients and principal contractors

Weather conditions

Levels of numeracy and literacy of workers

Non-English speaking workers



High risk areas for injuries in construction - ✔✔-Falls from height

Slips, trips and falls

Being struck by falling/moving objects

Manual handling



Construction (Design and Management) Regulations 2007 - ✔✔-Apply to all construction projects

Duties placed on clients, designers and all construction workers



CDM regs - notifiable projects - ✔✔-Construction phase will last longer than 30 days

Construction phase will involve more than 500 person days at work



Duty holders for notifiable projects - ✔✔-Client - have most influence

Designers - have responsibility beyond construction phase

Contractors - competence

CDM Co-ordinator - advise client of their duties, co- ordinates others

Principal contractor - safe working, co- ordination and co-operation between contractors

,CDM client duties - ✔✔-Appoint competent persons

Ensure suitable mgmt of welfare

Allow sufficient time and resources

Provide pre-construction info

Appoint duty holders for notifiable projects

Retain and provide access to health and safety file



CDM co-ordinator CDM duties - ✔✔-Advise and assist client with their duties

Notify HSE

Co-ordinate H&S aspects of design work and co-operate with others

Facilitate good communication

Liaise with principal contractor re ongoing design

Pass on pre-construction information

Prepare/update H&S file



Designer CDM duties - ✔✔-Check client is aware of their duties

Eliminate hazards and reduce risks during design

Provide information about remaining risks

Check CDM co-ordinator has been appointed

Provide any information needed for H&S file



Principal contractors CDM duties - ✔✔-Plan, manage and monitor construction phase

Prepare, develop and implement a written plan and site rules

Give contractors relevant parts of the plan

Provide suitable welfare facilities

Check competence of all appointees

Site inductions and further info and training

Consult with workers

, Liaise with CDM-c

Secure the site



Contractor CDM duties - ✔✔-Check client aware of duties

Plan, manage and monitor own work and that of workers

Check competence

Train own employees

Comply with part 4 of CDM regs

Ensure adequate welfare facilities

Co-operate with principal contractor



Pre-construction information - ✔✔-Description of the project

Management requirements and provisions

Environmental restrictions and existing risks on site

Design and construction hazards

Health and safety file



Construction phase H&S plan - ✔✔-Relevant info from pre-construction information

Project description and programme or works with key dates

Identify the organisation in place (mgmt structure, responsibilities and "who does what")

Identify arrangements in place to manage H&S risks

Show how construction work will be co-ordinated and how consultation will be achieved

Contain the H&S file



Health and safety file contains: - ✔✔-Brief description of the work carried out

As built dwgs

Survey info (e.g. Asbestos) and groundwork plans

Location of services

Alle Vorteile der Zusammenfassungen von Stuvia auf einen Blick:

Garantiert gute Qualität durch Reviews

Garantiert gute Qualität durch Reviews

Stuvia Verkäufer haben mehr als 700.000 Zusammenfassungen beurteilt. Deshalb weißt du dass du das beste Dokument kaufst.

Schnell und einfach kaufen

Schnell und einfach kaufen

Man bezahlt schnell und einfach mit iDeal, Kreditkarte oder Stuvia-Kredit für die Zusammenfassungen. Man braucht keine Mitgliedschaft.

Konzentration auf den Kern der Sache

Konzentration auf den Kern der Sache

Deine Mitstudenten schreiben die Zusammenfassungen. Deshalb enthalten die Zusammenfassungen immer aktuelle, zuverlässige und up-to-date Informationen. Damit kommst du schnell zum Kern der Sache.

Häufig gestellte Fragen

Was bekomme ich, wenn ich dieses Dokument kaufe?

Du erhältst eine PDF-Datei, die sofort nach dem Kauf verfügbar ist. Das gekaufte Dokument ist jederzeit, überall und unbegrenzt über dein Profil zugänglich.

Zufriedenheitsgarantie: Wie funktioniert das?

Unsere Zufriedenheitsgarantie sorgt dafür, dass du immer eine Lernunterlage findest, die zu dir passt. Du füllst ein Formular aus und unser Kundendienstteam kümmert sich um den Rest.

Wem kaufe ich diese Zusammenfassung ab?

Stuvia ist ein Marktplatz, du kaufst dieses Dokument also nicht von uns, sondern vom Verkäufer PassPoint02. Stuvia erleichtert die Zahlung an den Verkäufer.

Werde ich an ein Abonnement gebunden sein?

Nein, du kaufst diese Zusammenfassung nur für 10,88 €. Du bist nach deinem Kauf an nichts gebunden.

Kann man Stuvia trauen?

4.6 Sterne auf Google & Trustpilot (+1000 reviews)

45.681 Zusammenfassungen wurden in den letzten 30 Tagen verkauft

Gegründet 2010, seit 14 Jahren die erste Adresse für Zusammenfassungen

Starte mit dem Verkauf
10,88 €  1x  verkauft
  • (0)
  Kaufen