100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden
Vorher von dir gesucht
PRM3701 ASSESSMENT 2 SEMESTER 2 2024 Which of the following does NOT help describe a bottom-up estimating approach? a. They are made by someone who uses experience and/or information from someone else to determine overall project cost and duration. 2,70 €
In den Einkaufswagen
PRM3701 ASSESSMENT 2 SEMESTER 2 2024 Which of the following does NOT help describe a bottom-up estimating approach? a. They are made by someone who uses experience and/or information from someone else to determine overall project cost and duration.
11 mal angesehen 0 mal verkauft
Kurs
Project Management (PRM3701)
Hochschule
University Of South Africa (Unisa)
PRM3701 ASSESSMENT 2 SEMESTER 2 2024
Which of the following does
NOT help describe a bottom-up estimating approach?
a. They are made by someone who uses experience and/or information from someone else to determine overall project
cost and duration.
b. They establish low-cost, e cient me...
After reviewing the project scope statement, the owner specifies that costs MUST stay within R400,000. This criterion is
classified as
a. constrained.
b. enhanced.
c. accepted.
d. limited.
e. fixed.
Clear my choice
Question 2
Answer saved
Marked out of 1.00
The WBS is best suited for projects that have a tangible outcome. Which of the following is used when the final outcome of
the project is less tangible or is a product of a series of steps or phases?
a. Responsibility matrix
b. Organization breakdown structure
c. A work breakdown structure is still effective for these types of projects.
Consider a five-mile-long railroad tunnel. Tunnel experts and advocates estimate the total cost to be R200 million. What is the
reference class for this project? But reference class projects in this area have been over-budget by 30%. So, what should the
actual revised budget number be for this proposed five-mile tunnel project?
a. Past bridge projects, R230 million
b. Past tunnel projects, R260 million
c. Past highway projects, R200 million
d. Past building projects, R230 million
e. Past construction projects, R230 million
Clear my choice
Question 7
Answer saved
Marked out of 1.00
Which of the following does NOT help describe a bottom-up estimating approach?
a. They are made by someone who uses experience and/or information from someone else to determine overall project
cost and duration.
b. They establish low-cost, efficient methods for completing activities.
c. They typically come from the people actually doing the work and who are most knowledgeable about the task at
hand.
d. Estimates are made at the work package level and then "rolled up" to determine estimates for major deliverables and
for the project itself.
e. They can take place after the project has been planned in detail.
Alle Vorteile der Zusammenfassungen von Stuvia auf einen Blick:
Garantiert gute Qualität durch Reviews
Stuvia Verkäufer haben mehr als 700.000 Zusammenfassungen beurteilt. Deshalb weißt du dass du das beste Dokument kaufst.
Schnell und einfach kaufen
Man bezahlt schnell und einfach mit iDeal, Kreditkarte oder Stuvia-Kredit für die Zusammenfassungen. Man braucht keine Mitgliedschaft.
Konzentration auf den Kern der Sache
Deine Mitstudenten schreiben die Zusammenfassungen. Deshalb enthalten die Zusammenfassungen immer aktuelle, zuverlässige und up-to-date Informationen. Damit kommst du schnell zum Kern der Sache.
Häufig gestellte Fragen
Was bekomme ich, wenn ich dieses Dokument kaufe?
Du erhältst eine PDF-Datei, die sofort nach dem Kauf verfügbar ist. Das gekaufte Dokument ist jederzeit, überall und unbegrenzt über dein Profil zugänglich.
Zufriedenheitsgarantie: Wie funktioniert das?
Unsere Zufriedenheitsgarantie sorgt dafür, dass du immer eine Lernunterlage findest, die zu dir passt. Du füllst ein Formular aus und unser Kundendienstteam kümmert sich um den Rest.
Wem kaufe ich diese Zusammenfassung ab?
Stuvia ist ein Marktplatz, du kaufst dieses Dokument also nicht von uns, sondern vom Verkäufer BMZAcademy. Stuvia erleichtert die Zahlung an den Verkäufer.
Werde ich an ein Abonnement gebunden sein?
Nein, du kaufst diese Zusammenfassung nur für 2,70 €. Du bist nach deinem Kauf an nichts gebunden.