Buildings account for ___________ to _____________ percent of the world's energy use correct answers 1/3 to 1/2 one simple definition of _____________ is building to meet the needs of the present generation without compromising the ability of future generations to meet their needs correct answer...

[ Mehr anzeigen ]

vorschau 2 aus 6   Seiten

  • 20. august 2024
  • 6
  • 2024/2025
  • Prüfung
  • Fragen & Antworten
  • COSC 253
  • COSC 253

1  bewertung

review-writer-avatar

von: carson212 • 1 Monat vor

This is already on quizlet

avatar-seller
COSC 253 - Exam 1 || A+ Guaranteed.
Buildings account for ___________ to _____________ percent of the world's energy use correct
answers 1/3 to 1/2

one simple definition of _____________ is building to meet the needs of the present generation
without compromising the ability of future generations to meet their needs correct answers
sustainability

a _________-_______-__________ life cycle analysis (LSA) begins with materials extraction by
extends only as far as when the material leaves the factory correct answers cradle-to-gate

cradle-to-gate excludes what that cradle-to-grave does not? correct answers effects of
transportation to the building site, installation, maintenance, and disposal or recycling

a ___________-_________-____________ LCA is considered the most comprehensive method
of describing and quantifying environmental impacts associated with building materials correct
answers cradle-to-grave

what does LEED stand for? correct answers Leadership in Energy and Environmental Design

LEED recognizes four levels of sustainable design including... correct answers certified,
platinum, gold, and silver

within each LEED category are mandatory _________________ and optional ______________
that contribute points toward a building's overall sustainability rating correct answers
prerequisites, credits

construction documents fully describe the building to be constructed and typically consist of
graphic _________________________ (plans) and written ______________________ correct
answers construction drawings, specifications

_____________________ govern the types of activities that may take place on a given piece of
land, densities, setbacks, parking requirements, and bulk dimensions (height, footprint, etc.)
correct answers zoning ordinances

zoning ordinances can be used to protect what? correct answers historic areas

the ______________________ is a stand alone building code that regulates the construction of
one and two family dwellings correct answers international residential code (IRC)

to effectively use the international building code, one must know the proposed
________________ and ______________ correct answers occupancy classification, construction
type

, Prior to 2000, the three model codes in the US were the ____________ building code,
_________________ building code, and the ________________ building code correct answers
uniform, standard, national

in the US, the ____________________ is the predominate building code used today correct
answers international building code (IBC)

a ________________ code requirement contains detailed information, is simpler to implement,
and provides certainty for designers and builders correct answers prescriptive

a ________________ code requirement provides the standard for a particular building element
but does not include detailed information. For example, a wall that is required to have a two-hour
fire resistance rating correct answers performance

in conventional ____________/____________/___________ project delivery, the owner first
hires a design team to create construction documents. Once the construction documents are
complete, the owner invites construction firms to submit a bid before awarding the construction
project to the bidder deemed most suitable correct answers design, bid, build

in design/build project delivery, the owner contracts with one ____________ that ultimately
assumes responsibility for both design and construction correct answers entity

the ____________/___________ project delivery method readily accommodates fast track
construction correct answers design, build

in ____________________ construction, the owner contracts with a single entity that provides
not only design and construction services, but financing for the project as well correct answers
turnkey

with fixed-fee or ___________________ compensation, the general contractor is paid a fixed
dollar amount to complete the construction project correct answers lump sum

_____________________ compensation is most often used with projects for which the scope of
work is not fully known at the time compensation is established correct answers cost plus a fee

cost plus a fee compensation may include a _______________________ price correct answers
guaranteed maximum (GMAX or GMP)

_______________________ include bonuses or penalties for saving or overruns can be part of
any type of construction contract correct answers inactive provision

common types of surety bonds are _________________ and payment bonds correct answers bid
and performance

Alle Vorteile der Zusammenfassungen von Stuvia auf einen Blick:

Garantiert gute Qualität durch Reviews

Garantiert gute Qualität durch Reviews

Stuvia Verkäufer haben mehr als 700.000 Zusammenfassungen beurteilt. Deshalb weißt du dass du das beste Dokument kaufst.

Schnell und einfach kaufen

Schnell und einfach kaufen

Man bezahlt schnell und einfach mit iDeal, Kreditkarte oder Stuvia-Kredit für die Zusammenfassungen. Man braucht keine Mitgliedschaft.

Konzentration auf den Kern der Sache

Konzentration auf den Kern der Sache

Deine Mitstudenten schreiben die Zusammenfassungen. Deshalb enthalten die Zusammenfassungen immer aktuelle, zuverlässige und up-to-date Informationen. Damit kommst du schnell zum Kern der Sache.

Häufig gestellte Fragen

Was bekomme ich, wenn ich dieses Dokument kaufe?

Du erhältst eine PDF-Datei, die sofort nach dem Kauf verfügbar ist. Das gekaufte Dokument ist jederzeit, überall und unbegrenzt über dein Profil zugänglich.

Zufriedenheitsgarantie: Wie funktioniert das?

Unsere Zufriedenheitsgarantie sorgt dafür, dass du immer eine Lernunterlage findest, die zu dir passt. Du füllst ein Formular aus und unser Kundendienstteam kümmert sich um den Rest.

Wem kaufe ich diese Zusammenfassung ab?

Stuvia ist ein Marktplatz, du kaufst dieses Dokument also nicht von uns, sondern vom Verkäufer FullyFocus. Stuvia erleichtert die Zahlung an den Verkäufer.

Werde ich an ein Abonnement gebunden sein?

Nein, du kaufst diese Zusammenfassung nur für 10,39 €. Du bist nach deinem Kauf an nichts gebunden.

Kann man Stuvia trauen?

4.6 Sterne auf Google & Trustpilot (+1000 reviews)

45.681 Zusammenfassungen wurden in den letzten 30 Tagen verkauft

Gegründet 2010, seit 14 Jahren die erste Adresse für Zusammenfassungen

Starte mit dem Verkauf
10,39 €  1x  verkauft
  • (1)
  Kaufen