100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden
logo-home
P370 PRACTICE TEST QUESTIONS WITH REVISED AND UPDATED ANSWERS GRADED A+ 12,53 €   In den Einkaufswagen

Prüfung

P370 PRACTICE TEST QUESTIONS WITH REVISED AND UPDATED ANSWERS GRADED A+

 6 mal angesehen  0 mal verkauft
  • Kurs
  • P370 PRACTICE
  • Hochschule
  • P370 PRACTICE

P370 PRACTICE TEST QUESTIONS WITH REVISED AND UPDATED ANSWERS GRADED A+ The heart of Operations Management is the management of production systems. A production system uses to provide goods and services to the customer. a. Production, Workforce, Inventory b. Start-up, Alteration, Output c...

[ Mehr anzeigen ]

vorschau 2 aus 9   Seiten

  • 28. september 2024
  • 9
  • 2024/2025
  • Prüfung
  • Fragen & Antworten
  • P370 PRACTICE
  • P370 PRACTICE
avatar-seller
P370 PRACTICE TEST QUESTIONS
WITH REVISED AND UPDATED
ANSWERS GRADED A+
The heart of Operations Management is the management of production systems. A
production system uses to provide goods and services to the customer.

a. Production, Workforce, Inventory
b. Start-up, Alteration, Output
c. Input, Transformation, Output
d. Set-up, Conversion, Yield
e. Capacity, Sequencing, Efficiency - Answer-c. Input, Transformation, Output

Productivity increases when:

a. Inputs increase while outputs remain the same.
b. Inputs decrease while outputs remain the same.
c. Outputs decrease while inputs remain the same.
d. Inputs and outputs increase proportionately.
e. None of the answers are correct. - Answer-b. Inputs decrease while outputs remain
the same.

Which of the following factories is the most productive?

a. Factory V1, which uses 43 units of input to produce 38 units of output
b. Factory W15, which uses 28 units of input to produce 27 units of output
c. Factory X3A, which uses 57 units of input to produce 58 units of output
d. Factory Y3, which uses 120 units of input to produce 110 units of output
e. Factory ZZ3, which uses 260 units of input to produce 240 units of output - Answer-c.
Factory X3A, which uses 57 units of input to produce 58 units of output

Suppose we are using the CPM with three time estimates (PERT) to schedule a project.
What is the variance of the length of the critical path, if there is a 92.22% probability that
the project will be completed within the expected duration plus three time periods?
Select the nearest correct answer. (HINT: Use the Z formula to find the value)

a. 1.67
b. 2.34
c. 2.96
d. 3.19
e. 4.46 - Answer-e. 4.46

, z=Norm.s.inv(92.22)

standard dev=3(time estimates)/z

variance=standard deviation^2

As project manager, it is important to deal with the people issues as well as scheduling.
Which of the following project organizational structure would require your time and
attention to handle team members' frustration in dealing with two bosses?

a. Pure project structure
b. Matrix project structure
c. Functional project structure
d. Hierarchical project structure
e. Both A and B are acceptable project structures - Answer-b. Matrix project structure

A project has three sequences of activities (paths), two of which are critical. The critical
paths of this project can be characterized in the following way:

a. The slack times for each task in the entire project are zero.
b. The chain of activities (from start to finish) that has the largest sum of activity
durations.
c. The early start date and early finish date are always the same for each activity on the
critical path.
d. To reduce the project duration, you must reduce the slack time of a task on the
critical path.
e. None of the above are correct. - Answer-b. The chain of activities (from start to finish)
that has the largest sum of activity durations.

As Project Manager, it is important to deal with the people issues as well as scheduling.
which of the following would NOT require your time and attention?

a. In a functional project structure, possibly negotiating with the departments for the
people you need.
b. Intentional delaying of a project as the completion date draws near, by people on the
project as their means of resisting change.
c. In a functional structure, resistance of team members to working on tasks outside
their area of expertise.
d. In pure project structure, the team member's frustration in dealing with two bosses.
e. Motivating team members, especially in a functional structure. - Answer-d. In pure
project structure, the team member's frustration in dealing with two bosses.

A project has a critical path with a duration of 20 weeks and a standard deviation of 4
weeks. There is a 35% chance the project will be completed in X weeks or less. What is
X? Select the closest answer.

Alle Vorteile der Zusammenfassungen von Stuvia auf einen Blick:

Garantiert gute Qualität durch Reviews

Garantiert gute Qualität durch Reviews

Stuvia Verkäufer haben mehr als 700.000 Zusammenfassungen beurteilt. Deshalb weißt du dass du das beste Dokument kaufst.

Schnell und einfach kaufen

Schnell und einfach kaufen

Man bezahlt schnell und einfach mit iDeal, Kreditkarte oder Stuvia-Kredit für die Zusammenfassungen. Man braucht keine Mitgliedschaft.

Konzentration auf den Kern der Sache

Konzentration auf den Kern der Sache

Deine Mitstudenten schreiben die Zusammenfassungen. Deshalb enthalten die Zusammenfassungen immer aktuelle, zuverlässige und up-to-date Informationen. Damit kommst du schnell zum Kern der Sache.

Häufig gestellte Fragen

Was bekomme ich, wenn ich dieses Dokument kaufe?

Du erhältst eine PDF-Datei, die sofort nach dem Kauf verfügbar ist. Das gekaufte Dokument ist jederzeit, überall und unbegrenzt über dein Profil zugänglich.

Zufriedenheitsgarantie: Wie funktioniert das?

Unsere Zufriedenheitsgarantie sorgt dafür, dass du immer eine Lernunterlage findest, die zu dir passt. Du füllst ein Formular aus und unser Kundendienstteam kümmert sich um den Rest.

Wem kaufe ich diese Zusammenfassung ab?

Stuvia ist ein Marktplatz, du kaufst dieses Dokument also nicht von uns, sondern vom Verkäufer Perfectscorer. Stuvia erleichtert die Zahlung an den Verkäufer.

Werde ich an ein Abonnement gebunden sein?

Nein, du kaufst diese Zusammenfassung nur für 12,53 €. Du bist nach deinem Kauf an nichts gebunden.

Kann man Stuvia trauen?

4.6 Sterne auf Google & Trustpilot (+1000 reviews)

45.681 Zusammenfassungen wurden in den letzten 30 Tagen verkauft

Gegründet 2010, seit 14 Jahren die erste Adresse für Zusammenfassungen

Starte mit dem Verkauf
12,53 €
  • (0)
  Kaufen