100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden
Vorher von dir gesucht
FOREMAN CERTIFICATION PRACTICE TEST (UA LOCAL 469 FOREMAN CERTIFICATION PRACTICE TEST FLASH CARDS) QUESTIONS WITH LATEST SOLUTIONS!!14,82 €
In den Einkaufswagen
with which of the following costs should a foreman
using drawing what is the elevation of the top of
w
Schule, Studium & Fach
FOREMAN
FOREMAN
Verkäufer
Folgen
EvaTee
Deine Reviews
Inhaltsvorschau
FOREMAN CERTIFICATION PRACTICE TEST
(UA LOCAL 469 FOREMAN CERTIFICATION
PRACTICE TEST FLASH CARDS) QUESTIONS
WITH LATEST SOLUTIONS!!
If a foreman from a different trade approaches you claiming that one of your
crew members has been injured while working outside of his scope of work,
what would be the FIRST action you should take? Answer - Get the crew
member medical attention.
Which of the following is a true statement with respect to a foreman 's
responsibility related to his or her crew? Answer - The foreman is responsible
for anything that occurs at the jobsite from the beginning of the work day/shift
to the end of the work day/shift.
Why is preparation so important in a negotiation? Answer - Having time to
prepare and having a plan makes it easier to keep emotions in check.
The piping specifications required all wall penetrations to have a steel pipe
sleeve.The steam piping size is 4 inches SCH 80 carbon steel with 1 inch of
fiberglass insulation. What diameter of SCH 40 carbon steel sleeve is the
minimum that you can use? Answer - 8 inches
A member of your crew is being excessively loud and using inappropriate
language. As a foreman, what is the MOST effective course of action to take?
Answer - Explain to them that their behavior is inappropriate and may be
considered harassment by fellow crew members and by management
,What is the purpose of a separation notice? Answer - The purpose of a
separation notice is to identify the circumstances surrounding a termination.
With which of the following costs should a foreman be MOST concerned?
Answer - Labor
A(n) ________________ occurs when any condition or document modifies the
work as defined in the contract documents during the bidding process. Answer
- Change Order
On a project that requires 100% tie-off for elevated work, how many lanyards
are required on a full body harness? Answer - 2
The client is not happy with part of the project and wants to make a change.
What actions should you take to ensure the client is happy while ensuring that
progress on your job continues? Answer - Stop working on that portion of the
job that is at issue and contact your supervisor.
Using drawing, what is the elevation of the top of the 24 x 18 duct? Answer -
31 feet and 10 inches.
On the project blueprint there is a bank of four pipe runs with each pipe
measuring three inches in diameter which measure 12 inches in length on the
blueprint. The scale used on the blueprint is 1/4 inch equals 1 foot. How many
feet of 3 inch pipe should be ordered to complete the runs? Answer - 192 feet
Using the formula below, what is the correct 45 offset when you have a rolling
offset where the roll is 8 inches and the rise is 6 inches? Formula: Offset = roll 2
+ rise2 Answer - 10 inches.
, What is the first rule of negotiation? Answer - Understand the other person's
needs.
Assume that you need to purchase 1,000 feet of pipe for your assigned project.
If pipe costs $1.25 per foot, what is the cost of purchasing 40% of the total pipe
needed? Answer - $500
Which of the following describes the purpose of "Short Interval Planning? " or
"Look Ahead Planning"? Answer - Breaking the job into small manageable
pieces.
Which of the following correctly identifies what is included in legitimate labor
costs? Answer - Hourly wages, fringe benefit packages, payroll taxes, insurance
and safety costs,and small tools and consumables.
Calculate the number of hangers needed to support 275 feet of pipe if you
need a hanger placed every 8 feet? Answer - 35 hangers
The bid documents associated with your project state, "Do not remove or
disturb any asbestos containing material (ACM). " You have three days before a
planned outage/shutdown to remove a 12-inch insulated gate valve that you
suspect has an asbestos covering. What should you do? Answer - Contact your
supervisor for proper procedures and instructions on how you should proceed.
When is it best to perform site safety inspections? Answer - Every day that
work is in progress.
Using Figure 2, what is the elevation of "U" ? Answer - -0 feet and 6 inches.
Alle Vorteile der Zusammenfassungen von Stuvia auf einen Blick:
Garantiert gute Qualität durch Reviews
Stuvia Verkäufer haben mehr als 700.000 Zusammenfassungen beurteilt. Deshalb weißt du dass du das beste Dokument kaufst.
Schnell und einfach kaufen
Man bezahlt schnell und einfach mit iDeal, Kreditkarte oder Stuvia-Kredit für die Zusammenfassungen. Man braucht keine Mitgliedschaft.
Konzentration auf den Kern der Sache
Deine Mitstudenten schreiben die Zusammenfassungen. Deshalb enthalten die Zusammenfassungen immer aktuelle, zuverlässige und up-to-date Informationen. Damit kommst du schnell zum Kern der Sache.
Häufig gestellte Fragen
Was bekomme ich, wenn ich dieses Dokument kaufe?
Du erhältst eine PDF-Datei, die sofort nach dem Kauf verfügbar ist. Das gekaufte Dokument ist jederzeit, überall und unbegrenzt über dein Profil zugänglich.
Zufriedenheitsgarantie: Wie funktioniert das?
Unsere Zufriedenheitsgarantie sorgt dafür, dass du immer eine Lernunterlage findest, die zu dir passt. Du füllst ein Formular aus und unser Kundendienstteam kümmert sich um den Rest.
Wem kaufe ich diese Zusammenfassung ab?
Stuvia ist ein Marktplatz, du kaufst dieses Dokument also nicht von uns, sondern vom Verkäufer EvaTee. Stuvia erleichtert die Zahlung an den Verkäufer.
Werde ich an ein Abonnement gebunden sein?
Nein, du kaufst diese Zusammenfassung nur für 14,82 €. Du bist nach deinem Kauf an nichts gebunden.