Nicole Senyurt _Unit 2_Assignment C
Bruno Batista Da Silva _Unit 2_Assignment C
Hudayfe Yassin_Unit 2_Assignment C
Richard Billedo_Unit 2_Assignment C
Jahsiah Weekes_Unit 2_Assignment C
Miran Abduirahman_Unit 2_Assignment C
Engineering Project Quality Plan
ITEM SubCategory Question Answer
PROJECT GOAL:
1 Project Aim What is the project Our goal is to be able to
objective? produce a batch of five
different types of
screwdrivers.
Discuss your role as an
effective team leader in
manufacturing the
screwdrivers
Discuss the requirements
in setting up the
manufacturing process.
Ensure that you include
safety, efficiency and
quality aspects in your
answers. You will be
expected to produce a risk
assessment for at least
one engineering process
and discuss any
necessary set-up
activities.
SCOPE
2 What are the parameters By planning an effective
by which this outcome will project plan and assigning
be achieved? each separate task to
each assignee. This will
ensure that when the
individual tasks have been
complete it will help us to
be efficient and put in
team effort.
Also by doing the
independent research
tasks first, this will help us
, to then be able to focus on
the specific team activities
such as risk assessments
as this is not a one man
job.
TASK SCHEDULING
3 What are the tasks and There are roughly 4 tasks:
the assignees? Research type of
screwdrivers
including
different tips and
lengths
(Hudayfe/Jahsiah
)
Research the
manufacturing
processes
involved and
health and safety
and advantages
and limitations to
these processes
( Nicole/Richard)
Research Human
factors in the
effectiveness of
the teamwork
( Bruno/Miran)
Creating a risk
assessment
(Hudayfe )
Quality control
charts( Richard)
Team Records
Meetings (Scribe
is Nicole,but
everyone is
involved in the
meetings)
Team Leader
effectiveness
role( Nicole)
COMMUNICATION
4 How will communication Due to COVID-19,we
internally and externally cannot currently proceed
take place? with the team project
externally thus we have to
use other means including
internal communication.
5 What form of Microsoft Teams
communication will be
used?
6 What are secondary Emails
, modes of communication?
7 How often will routine This will take place
communication take regularly for a week
place?
8 What are the names of Project team leader-
each project team leader Nicole Senyurt
and team member?
Team Members-
Jahsiah Weekes,Miran
Abduirahman,Richard
Billedo,Hudayfe Yassin &
Bruno Batista Da Silva
WORK HOURS & TASKS
9 WORK HOURS How many total work
hours should be allocated
for this project?
Dept Tasks Estimated total hours Overtime Allowed?
and when is it complete
Research type of 1-2 hours Yes
screwdrivers including
different tips and lengths Complete by 06/2/21
(Hudayfe)
10 Research the 3-5 hours Yes
manufacturing processes
involved and health and
safety and advantages Complete by
and limitations to these 07/2/21
processes (Nicole)
11 Research Human factors
2-3 hours Yes
in the effectiveness of the
teamwork (Bruno)
Complete by
09/2/21
12 Creating a risk 2-5 hours No
assessment(Hudayf Complete by
e 07/2/21
13 Record of Team 1-2 hours No
Meetings (Nicole) Complete by
07/2/21
13 Activity Log 2-3 hours Yes
, (Scribe: Nicole but Complete by
everyone is 11/2/21
involved in the
logging)
14 Quality Control 1-2 hours No
Chart (Nicole) Complete by
08/2/21
15 Review tasks (All of 20 mins Yes
us) Complete by
11/2/21
RISKS, ASSUMPTIONS, CONDITIONS, RESTRAINTS
16 Dependencies, and Define all of the risks and The risks are involved with
Restraints the plan for mitigating the manufacturing
them, assumptions each processes including the
stakeholder should be equipment
operating under, used,chemicals and the
conditional processes, environment.
and restraints that may In order to mitigate
need to be overcome, and them ,we have to research
the method for alternative methods and
overcoming them (see also follow the health and
separate risk safety regulations
assessment) including PPE.
Restraints include
equipment and materials.
To overcome, use
different sustainable
alternatives to metals and
how they increase
profitability and also the
safety of our products too.
FINAL APPROVAL
17 Final Approval Have you received final Yes
plan approval from both
client and project team?
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller nicolesenyurt1. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.28. You're not tied to anything after your purchase.