100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ENG 101 Test QUESTIONS & ANSWERS LATEST UPDATE $15.49   Add to cart

Exam (elaborations)

ENG 101 Test QUESTIONS & ANSWERS LATEST UPDATE

 12 views  0 purchase
  • Course
  • Institution

ENG 101 Test QUESTIONS & ANSWERS LATEST UPDATE

Preview 3 out of 27  pages

  • April 15, 2022
  • 27
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
2.1-2.3
1) The key input to the Stakeholder Requirements Definition Process is
Capability needs and other interested party requirements


2) The set of Stakeholder Requirements normally includes both Acquirer Requirements and Other
Interested Party Requirements.
True



3) One of the key roles of the Systems Integrated Product Team in Stakeholder Requirements Definition
is to transform the defined stakeholder requirements into a set of desired quantitative technical
requirements.
True



4) “System attributes or characteristics that are considered critical or essential to the development of an
effective military capability” is a definition of:
A Key Performance Parameter (KPP)



5) Well-written, quality requirements should be: Select the three correct answers.

Unambiguous


Verifiable


Achievable


2) Forms of the products realized from the Implementation Process are not dependent on the Defense
Acquisition Lifecycle phase that the program is in.
False


3) A Technical Data Package (TDP) could contain all of the following, EXCEPT

An Analysis of Alternatives (AoA)


Interface descriptions and Interface Control Documents (ICDs)


Fabrication and manufacturing requirements


Drawings, wiring diagrams, sketches


Key product characteristics

, 4) The term “Six Sigma” as used in the context of manufacturing processes refers to: Select the two
correct answers.
Driving defects and quality errors to low levels
Controlling a manufacturing process by reducing part variability
Application of Just-in-Time supply processes to minimize parts storage
The heavy use of E-Manufacturing

1) The key output of the Stakeholder Requirements Definition Process is: Select the correct answer.
Baselined Technical Requirements


Capability Needs


Logical Models


Acquirer Requirements


2) A requirement that is defined as “being an output of the Stakeholder Requirements Definition
Process and expressed in confirmed and quantitative ‘shall’ statements” is a:
Technical Requirement



3) The role of the Systems Requirements IPT is to convert technical requirements to stakeholder
requirements.
False


4) A measurement of the degree to which life cycle services for an End Product will provide required
levels of supportability is a characteristic of:
A Measure of Suitability (MOS)


5) Well-written, quality requirements should be: Select the three correct answers


Unambiguous


Verifiable


Achievable



1) What is the primary purpose of the Stakeholder Requirements Definition Process? [Describe the
purpose, inputs and outputs, and activities of the Stakeholder Requirements Definition Process.]
2.3
1) The purpose of the Requirements Analysis Process is to transform a set of Stakeholder Technical
Requirements into Logical Analysis Models and Derived Technical Requirements.

, True


2) Outputs from the Requirements Analysis Process become the inputs for the Architecture Design
Process.
True



3) What types of requirements are not explicitly stated in a higher-level set of requirements, but still
must be satisfied in order to provide a complete solution? Select the two correct answers.
Acquirer Requirements that are derived from Stakeholder Requirements



Derived Requirements needed to satisfy one or more Stakeholder Requirements


4) Part of bi-directional traceability involves tracing each Derived Technical Requirement upward
ultimately to its source set of Technical Requirements.

False



6) Quality Function Deployment (QFD) is a substitute for all of the System Engineering top-down
design processes. [Explain the role of Quality Function Deployment]
False


1) Which of the following is the primary purpose of the Requirements Analysis Process?

To develop sets of functional architectures and the relationships among them




2) A “Derived Requirement” is one that is not explicitly stated in the set of Stakeholder Requirements
yet required to satisfy one or more of them.
True



3) Why is the attribute of bi-directional traceability considered to be so important? Select the four
correct answers.
It facilitates traceability of effort throughout the Requirements Analysis Process


It helps to ensure each requirement is implemented by at least one function



It relates functions back to their system Technical Requirements

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TestGen. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75619 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart