100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
TRL3705 ASSIGNMENT 2 YEAR 2024, SEM 2 $6.02   Add to cart

Exam (elaborations)

TRL3705 ASSIGNMENT 2 YEAR 2024, SEM 2

1 review
 73 views  2 purchases
  • Course
  • Institution

EXACT SOLUTIONS FOR YOUR CURRENT ASSIGNMENT. DOCUMENT FORMULATED FOLLOEING UNISA STANDARDS. EASY TO UNDERSTAND AND COMPREHENCE.

Preview 2 out of 9  pages

  • April 24, 2022
  • 9
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers

1  review

review-writer-avatar

By: yonnamk • 2 year ago

avatar-seller
Trl3705 ASSIGNMENT 2
WE ALIGHT TUTORIALS


➢ CONTACT DETAILS; CALL/APP +27611279778
➢ EMAIL ADDRESS; wealighttutorials@gmail.com

, QUESTION 1

AN UNDERSTANDING OF THE CORE THEORIES FOR PASSENGER AND RAIL
FRIEGHT SERVICES.

National Passenger Rail Plan objective was to arrest the decline in passenger rail
services and secure a sustainable passenger rail services. The approach was to
concentrate the majority of available resources on high intensity ‘Priority Rail
Corridors’. The determination of these corridors is based on where rail is able to
perform to its strength as a high capacity people mover. Other routes will be retained
but given lower priority until such time as the business prospects of the industry
improve (DOT, 2005). The main benefit of the priority corridors strategy is to offer the
only sustainable option to restore value for money for Government’s investment in
passenger rail transport. In the medium to long term the National Rail Plan holds out
the prospect of increased use of the rail network on the priority corridors with more
effective, regionally based monitoring of finances and operational performance
(SARCC, 2006).

National Passenger Rail Plan By 2004 the rail business in South Africa was facing
serious challenges such as peak hour services operating at crush loading, network
utilization being below capacity due to rolling stock unavailability. Government and
the rail commuter business were in dire need of a national plan to align national
policies, travel needs and business requirements, with implementation plans, for the
rail commuter business. The Department of Transport started the process of the
National Passenger Rail Plan known as the Rail Plan. The methodology applied in
the Rail Plan process was to examine the current role of commuter rail transport
within the wider travel demand trends in South Africa and, to analyse and quantify
the financial, operational and technical dynamics of the industry (DOT, 2005). The
process of the Rail Plan was divided into two phases. The first phase focused on
developing the overall strategy for the passenger rail sector and the preparation of
regional rail plans for a focused new strategic direction. During the second phase the
department focused on consultation with provinces and metropolitan authorities in
the finalisation of regional plans. More emphasis was to quantify the specific
infrastructural and rolling stock interventions required to restore the levels of service
in regional corridors (SARCC, 2006).

At a strategic level the implementation of the plan targeted both operational and
infrastructure improvements in priority corridors. In the Tshwane region the
interventions on the Mabopane - Pretoria Central corridor included station upgrade in
Pretoria North, replacement of electrical equipment’s such as traction transformers.
Mamelodi - Pretoria Central corridor interventions included platform extensions at
Mamelodi stations and track upgrade and track doubling on the corridor. Wits region
interventions focused on Soweto - Johannesburg and Naledi - New Canada
corridors. The interventions include signal systems upgrades, station upgrades,

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller wealighttutorials. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $6.02. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76669 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$6.02  2x  sold
  • (1)
  Add to cart