1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project 2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards 3.Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keep the value stream moving at minimum velocity. 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting patient demand for a reasonable length of time • Discovery of the bottleneck operation 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? • MRP (Material Requirements Plan) • ERP (Enterprise Resource Planning) • MPS (Master Production Schedule) • WBS (Work Breakdown Structure) 7. Which of the following is an element that addresses elimination of waste under lean production? • Kanban production control system • Production ahead of demand • Minimized run times • Group plant loading technology 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? • Level elements • Future elements • Past elements • Cyclical elements 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: • Reducing product quality during the assembly process • Designing products so they can be manufactured by a virtual factory • Reducing equipment in the production process • Simplification of the product by reducing the number of separate parts 10. Which of the following is one of the principles of reengineering? • Quality at the source • Do not select suppliers on the basis of price alone. • Have those who use the output of a process perform the process. • Leverage high cost employees with lower cost employees.

Mehr anzeigen Weniger lesen
Hochschule
Kurs

Inhaltsvorschau

OPS 571 Final Exam ALL ANSWERS 100% CORRECT

SPRING FALL-2022 SOLUTION GUARANTEED GRADE

A+


1. Which of the following is considered a major process flow structure?
• Lead Time
• Fabrication
• Lean Manufacturing
• Project
2. ISO audits result in certifications that are done by first, second, or third parties. Which of
the following result in the best certification of a firm?
• Certification is sought by any firm assuming they pay annual dues.
• 2nd Party – where a customer audits its supplier
• 3rd Party – where a qualified national or international standards/certifying
agency serves as an auditor
• 1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
• Quality management
• Time management
• Continuous improvement management
• Environmental management
4. Which is the one correct value stream principle?
• Look for efficiencies in the factory, office, physical, procedural, and technical
operations.
• Eliminate waste that stops, slows down, or diverts the value stream.
• Concentrate on speeding up value-adding operations rather than removing waste.
• Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
• Determining the effective capacity over time
• Estimating design capacity
• Forecasting patient demand for a reasonable length of time
• Discovery of the bottleneck operation

, 6. Which of the following is considered an organizational blueprint, which prescribes the
quantity and time frame for when each end product will be assembled?
• MRP (Material Requirements Plan)
• ERP (Enterprise Resource Planning)
• MPS (Master Production Schedule)
• WBS (Work Breakdown Structure)
7.Which of the following is an element that addresses elimination of waste under lean
production?
• Kanban production control system
• Production ahead of demand
• Minimized run times
• Group plant loading technology
8. In most cases, demand for products or services can be broken into several components.
Which of the following is considered a component of demand?
• Level elements
• Future elements
• Past elements
• Cyclical elements
9. Design for manufacturing and assembly delivers product improvements by emphasizing
which of the following:
• Reducing product quality during the assembly process
• Designing products so they can be manufactured by a virtual factory
• Reducing equipment in the production process
• Simplification of the product by reducing the number of separate parts
10. Which of the following is one of the principles of reengineering?
• Quality at the source
• Do not select suppliers on the basis of price alone.
• Have those who use the output of a process perform the process.
• Leverage high cost employees with lower cost employees.
11. Which of the following is a characteristic that can be used to guide the design of service
systems?
• Services are all similar.
• Services businesses are inherently entrepreneurial.
• Quality work means quality service.
• Services cannot be inventoried.
12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the
following is given to a supply chain which has an evolving supply process based on
functional products?

Schule, Studium & Fach

Hochschule
Kurs

Dokument Information

Hochgeladen auf
11. juli 2022
Anzahl der Seiten
6
geschrieben in
2021/2022
Typ
Prüfung
Enthält
Fragen & Antworten

Themen

Lerne den Verkäufer kennen

Seller avatar
Bewertungen des Ansehens basieren auf der Anzahl der Dokumente, die ein Verkäufer gegen eine Gebühr verkauft hat, und den Bewertungen, die er für diese Dokumente erhalten hat. Es gibt drei Stufen: Bronze, Silber und Gold. Je besser das Ansehen eines Verkäufers ist, desto mehr kannst du dich auf die Qualität der Arbeiten verlassen.
Allan100 Rasmussen College
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
646
Mitglied seit
5 Jahren
Anzahl der Follower
605
Dokumente
3231
Zuletzt verkauft
1 Jahren vor

3.5

92 rezensionen

5
36
4
17
3
15
2
5
1
19

Beliebte Dokumente

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen