SPRING FALL-2022 SOLUTION GUARANTEED GRADE
A+
1. Which of the following is considered a major process flow structure?
• Lead Time
• Fabrication
• Lean Manufacturing
• Project
2. ISO audits result in certifications that are done by first, second, or third parties. Which of
the following result in the best certification of a firm?
• Certification is sought by any firm assuming they pay annual dues.
• 2nd Party – where a customer audits its supplier
• 3rd Party – where a qualified national or international standards/certifying
agency serves as an auditor
• 1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
• Quality management
• Time management
• Continuous improvement management
• Environmental management
4. Which is the one correct value stream principle?
• Look for efficiencies in the factory, office, physical, procedural, and technical
operations.
• Eliminate waste that stops, slows down, or diverts the value stream.
• Concentrate on speeding up value-adding operations rather than removing waste.
• Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
• Determining the effective capacity over time
• Estimating design capacity
• Forecasting patient demand for a reasonable length of time
• Discovery of the bottleneck operation
, 6. Which of the following is considered an organizational blueprint, which prescribes the
quantity and time frame for when each end product will be assembled?
• MRP (Material Requirements Plan)
• ERP (Enterprise Resource Planning)
• MPS (Master Production Schedule)
• WBS (Work Breakdown Structure)
7.Which of the following is an element that addresses elimination of waste under lean
production?
• Kanban production control system
• Production ahead of demand
• Minimized run times
• Group plant loading technology
8. In most cases, demand for products or services can be broken into several components.
Which of the following is considered a component of demand?
• Level elements
• Future elements
• Past elements
• Cyclical elements
9. Design for manufacturing and assembly delivers product improvements by emphasizing
which of the following:
• Reducing product quality during the assembly process
• Designing products so they can be manufactured by a virtual factory
• Reducing equipment in the production process
• Simplification of the product by reducing the number of separate parts
10. Which of the following is one of the principles of reengineering?
• Quality at the source
• Do not select suppliers on the basis of price alone.
• Have those who use the output of a process perform the process.
• Leverage high cost employees with lower cost employees.
11. Which of the following is a characteristic that can be used to guide the design of service
systems?
• Services are all similar.
• Services businesses are inherently entrepreneurial.
• Quality work means quality service.
• Services cannot be inventoried.
12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the
following is given to a supply chain which has an evolving supply process based on
functional products?