DCPO Exam 2023 Answered Correctly
DCPO Exam 2023 Answered Correctly. What is an index of a complete set of Maintenance Requirement Cards (MRCs) applicable to a ship system, subsystem, or equipment? Answer- The MIP is an index of a complete set of MRCs applicable to a ship system, subsystem, or equipment What is the proper procedures to substitute PMS Materials on a MRC? Answer- The proper procedure is to line out the Material and have the WCS initial it What is the purpose of the 3-m system? Answer- To ensure maximum equipment operational readiness. What is the definition of preventative maintenance? Answer- Maintenance designed to prevent or discover equipment failures What are examples of Inactive Equipment Maintenance periodicity codes? Answer- LU1 is an example of a periodicity code Who is responsible for performing assigned scheduled maintenance requirements? Answer- The maintenance person is responsible The last column on the weekly board is for? Answer- Checks due in the next four weeks Upon completion of the maintenance requirement, the maintenance person takes what action? Answer- The maintenance person informs the WCS The maintenance man is responsible for documenting the maintenance actions on the weekly schedule? Answer- False
Escuela, estudio y materia
- Institución
-
Grand Canyon University
- Grado
-
DCPO (DCPO)
Información del documento
- Subido en
- 20 de enero de 2023
- Número de páginas
- 12
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
- dcpo
- dcpo exam 2023 answered
- dcpo exam 2023
-
dcpo exam 2023 answered correctly