CTS 2023 Exam Prep Questions With Correct Answers
CTS 2023 Exam Prep Questions With Correct Answers What are the four teams that comprise the overall Project Team? - CORRECT ANSWERS Owner, Design, Installation, and Management Who would belong to the Design team? - CORRECT ANSWERS Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? - CORRECT ANSWERS Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - CORRECT ANSWERS Owner Which group represent the generic roles that are important to the Project process? - CORRECT ANSWERS Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - CORRECT ANSWERS Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - CORRECT ANSWERS Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - CORRECT ANSWERS Programming, Building Design, AV Bid, and Move-In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - CORRECT ANSWERS Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? - CORRECT ANSWERS System and infrastructure design and facility functionality may suffer What are some of the important project scope and size considerations in selecting an AV provider? - CORRECT ANSWERS Financial Stability, Current Workload, and Company Credentials What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel, and Warranty Response Time? - CORRECT ANSWERS RFQ a significant difference between the Two-Envelope Bid Method and the Qualifications- Based Selection Method? - CORRECT ANSWERS Negotiate with the highest ranking firm to finalize the contract What is one of the disadvantages of contracting the AV integrator to the electrical subcontractor? - CORRECT ANSWERS More layers of responsibility and communication When conducting a complete project bid process, what milestone follows the issuing of the RFP? - CORRECT ANSWERS Pre-Bid Meeting Under what circumstances would you likely use an A305-1986 form? - CORRECT ANSWERS Scoring responses to an RFQ What is the ideal way to contract an AV integrator? - CORRECT ANSWERS Directly to the Owner
Written for
- Institution
- CTS
- Course
- CTS
Document information
- Uploaded on
- February 3, 2023
- Number of pages
- 23
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- cts 2023 exam prep
-
cts 2023 exam prep questions with correct answers
-
what are the four teams that comprise the overall project team
Also available in package deal