100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
LEED v4 AP BD+C Practice Tests (1-3) Answered With Rationale/LEED v4 AP BD+C Practice Test #1 | LEED v4 AP BD+C Practice Test #2 | LEED v4 AP BD+C Practice Test #3 $14.99   In winkelwagen

Tentamen (uitwerkingen)

LEED v4 AP BD+C Practice Tests (1-3) Answered With Rationale/LEED v4 AP BD+C Practice Test #1 | LEED v4 AP BD+C Practice Test #2 | LEED v4 AP BD+C Practice Test #3

 3 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

LEED v4 AP BD+C Practice Tests (1-3) Answered With Rationale/LEED v4 AP BD+C Practice Test #1 | LEED v4 AP BD+C Practice Test #2 | LEED v4 AP BD+C Practice Test #3 LEED v4 AP BD+C Practice Test #1 # A project's total site area is 280,000 SF (26,000 m2). The total previously developed ...

[Meer zien]

Voorbeeld 4 van de 81  pagina's

  • 5 mei 2023
  • 81
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
LEED v4 AP BD+C Practice Tests (1-3) Answered With
Rationale/LEED v4 AP BD+C Practice Test #1 | LEED v4
AP BD+C Practice Test #2 | LEED v4 AP BD+C
Practice Test #3



LEED v4 AP BD+C Practice Test #1

# A project's total site area is 280,000 SF (26,000 m2). The total previously
developed area on site is 100,000 SF (9,290 m2). The building FAR is 1.7. How
much financial support would an owner have to provide to ear SS credit Site
Development - Protect or Restore Habitat?

A) $112,000
B) $72,000
C) $122,400
D) $40,000
A) $112,000

Feedback:

This type of question will likely include additional, extraneous information to cause
confusion. For Option 2 Financial Support, the requirement is as follows:

$0.40/SF ($4/m2) for the total site area including the building footprint.

280,000 X $0.40 = $112,000
# Which non-mandatory steps could a project team take prior to conducting air-
quality testing that would improve the test results for EQ Credit IAQ Assessment?
(Choose 2)
A) Vacuum using a vacuum cleaner with filtration media.
B) Test and balance the HVAC system
C) Install finishes and furniture
D) Clean with low-emitting cleaning products
E) Complete punch-list items that would generate VOCs or other contaminants.
A) Vacuum using a vacuum cleaner with filtration media.
D) Clean with low-emitting cleaning products

Notes:
Here are the required steps before a flush-out or air testing:
Install all finishes and furniture
For residential projects, install owner-provided furniture

,Complete punch-list items that would generate VOCs or other contaminants
Test and balance the HVAC system
# A project team has hired a LEED consultant to assist them with their first LEED
project. What will the consultant need to tell the project team to take photographs
of if they choose to pursue those credits?

A) SS Credit Rainwater Management
B) EQ Credit Construction IAQ Management Plan
C) LT Credit Surrounding Density and Diverse Uses
D) LT Credit Access to Quality Transit
B) EQ Credit Construction IAQ Management Plan

Feedback:

Construction Management IAQ Management Plan requires photos that highlight the
implemented construction IAQ practices.

LT Credit Surrounding Density and Diverse Uses does not require a photo, but a phot is
one alternative for providing the site vicinity plan. Sketches, block diagrams, and maps
can also be used.

LT Credit Access to Quality Transit does not require photos.

SS Credit Rainwater Management does not require a photo or drawing.
# A university housing project with 100 one-bedroom apartments has a baseline
parking capacity of 1 parking space/unit from the ITE handbook.
The project will earn 1 point under LT Credit Surrounding Density AND Diverse
Uses BUT NOT earn LT Credit Access to Quality Transit.
The project includes off-street parking.
How many preferred parking spaces for carpools must the project include for LT
Credit Reduced Parking Footprint?
A) 5 spaces
B) 3 spaces
C) 0 spaces
D) 2 spaces
B) 3 spaces
Notes:
A 20% reduction is required for project that DO NOT earn points for either LT Credit
Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit.
A 40% reduction is required for projects that DO earn points under either LT Credit
Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit.
This project has earned one of the credits, so a 40% reduction is required.
If any off-street parking spaces are provided, the project must include preferred parking
for carpools for 5% of the total parking capacity. The preferred parking is calculated
AFTER the reductions have been made.

,100 spaces baseline from the ITE handbook X 60% (40% reduction) = 60 total spaces
60 spaces X 5% preferred parking = 3 spaces
# A project team is designing a three-story office building with mechanical
ventilation. The project owner wants to emphasize a healthy indoor space for the
occupants. Where should outdoor air intake be located in order to minimize and
control the entry of pollutants?
A) Next to the air-handling units
B) One-third of the way up the side of the building
C) On the roof
D) Below-grade
B) One-third of the way up the side of the building

Notes:
For exterior contaminant prevention, outdoor air intakes are best located one-third of the
way up the side of a building.
# If a project team is pursuing the option to install EVSE for green parking, to
which requirements regarding charging must the team adhere? (Choose 3)
A) The EVSE must comply with regional standards.
B) The emissions from the electricity used by the green vehicle must be
calculated .
C) The electricity for the EVSE must come from renewable sources.
D) The green vehicle must be charged within a 4-hour period.
E) The EVSE must have network capability.
F) The EVSE must have a Level-2 capacity or higher.
A) The EVSE must comply with regional standards.
E) The EVSE must have network capability.
F) The EVSE must have a Level-2 capacity or higher.


Therea re three criteria for EVSE
1. A level 2 or highter chargin capacity
2. compliance with the regional standard, in the use, the most common regional
standard for these facilities is the Society of Automtive Engineers STandard J1772.
Outside the U.S., the International Electro Techanical Commission Standard 62196 is
common.
3. The EVSE must be Internet addressable. That allows for participation in demand
response programs or time and use pricing.
# A project team in a goal-setting meeting is discussing potential sites and
integrative synergies. What strategy would earn the project a LEED credit?

A) Locating a project's functional entry within 200-yards (180-meters) walking
distance of
a bicycle network that connects within 3 miles (4,800 meters) of a LEED v4 LEED
ND Certified Plan project
B) Locating the project in an area that has received LEED v4 LEED ND
Conditional Approval

, C) Reducing parking by 10% from the required baseline ratio of the project type
D) Locating the site in an area with a combined surrounding density of 22,000 SF /
acre
(5,050 m2 / hectare) of buildable land
D) Locating the site in an area with a combined surrounding density of 22,000 SF / acre
(5,050 m2 / hectare) of buildable land

This is the minimum density for LT Credit Surrounding Density and Diverse Uses Option
1 Surrounding Density.
# A project team is reviewing potential sites in an urban area. What strategy will
help in maintaining and enhancing the character of the community?
A) Minimizing the building footprint
B) Using salvaged materials on the interior of the project
C) Building in a historic area
D) Increasing the density of the project
C) Building in a historic area

LT Credit High-Priority Site rewards projects for building in historic districts, where
projects can help maintain the community character.
# Under what circumstances are projects exempt from WE Prerequisite Outdoor
Water Use
Reduction?
A) If the project is being certified under the LEED BD+C: Warehouses and
Distribution
Centers rating system
B) If the project is located outside the U.S. and cannot obtain precipitation data
C) If the project will use 100% non-potable water for irrigation
D) If the project has no landscaped areas
D) If the project has no landscaped areas FEEDBACK Projects with no landscaping,
such as those in urban areas with zero-lot-lines, are exempt from the prerequisite.
# A project team member was not clear about the specifications for building
materials, and a contractor substituted a product with disclosure documentation
for a product without disclosure documentation. The replacement product has a
GreenScreen v1.2 Benchmark. How should the product be treated as it applies to
MR Credit Building Product Disclosure and Optimization - Material Ingredients?
A) Exclude the product from the disclosure option and include it in the
optimization option
B) Include the product in both the disclosure option and the optimization option
C) Exclude the product from both the disclosure and optimization options
D) Treat the product at 50% of its cost
A) Exclude the product from the disclosure option and include it in the optimization
option FEEDBACK Each Building Product Disclosure and Optimization credit has an
option for disclosure and another option for optimization. Each option is worth 1 point,
and projects can earn 2 points each for the credit.
# A project team member is comparing an LCA model to a baseline design to
determine the reductions in six impact categories. One impact category exceeds

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper ACADEMICAIDSTORE. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor $14.99. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 85443 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


$14.99
  • (0)
  Kopen