DBIA: Principles of Design-Build and Post Award & Contracts Study Guide with complete solution Miller Act 1935 Federal Government passed bond requiring payment and performance bonds on all public works, what year? Brooks Bill 1972 Bill directing A/E's selected on qualifications, what year? C...

[Show more]

Preview 2 out of 7  pages

  • May 9, 2023
  • 7
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
DBIA: Principles of Design-Build and Post Award &
Contracts Study Guide with complete solution
Miller Act 1935
Federal Government passed bond requiring payment and performance bonds on all
public works, what year?
Brooks Bill 1972
Bill directing A/E's selected on qualifications, what year?
Clinger Cohen Act/Defense Procurement Reform Act 1996
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation
existed allowing Design-Build.
Standard of Care
The level of quality that any average Design Professional would be able to perform
given the circumstances.
Design Bid Build
Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they
want),
Multi Prime
Project Delivery - Many contracts through Owner
CM at Risk
Project Delivery method allowing the contractor to come on board very early in design
for preconstruction services yet maintains separation between Designer and Builder
contractually.
Design Build
Fastest Project Delivery method, fast tracking possible overlapping design with
construction utilizing incremental packages.
Low Bid
Procurement Method - Most Familiar
Negotiated (Qualifications Based)
Procurement Method - Common for A/E
Best Value
Procurement Method - Qualifications and Price
Sole Source
Procurement Method - Direct
Lump Sum
Contract Format w/ agreed upon fixed price
Cost Plus Fee
Contract Format - contractor reimbursed for actual cost plus an agreed upon
percentage
GMP (Guaranteed Maximum Price)
Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual
cost plus a fee only up to a certain amount.
Unit Price
Contract Format - cost per piece
Target Price

, Contract Format - established cost/benchmark determined jointly by project team.
Trust, Flexibility
Successful Design Build requires _____ & _______ between participants
Hammurabi
Singular responsibility for both design & construction was first codified by ____
Bridging Documents
Owner provided items such as 20% design or more and provides prescriptive specs at
RFP.
Spearin Doctrine
Owner is responsible for implied warranties in the sufficiency of the specifications.
Performance Requirements
____ ____ should identify end results.
Design Build
Single point of responsibility for both design & construction is an attribute of what
delivery method?
Substantiation
The process of checking milestones along the way for completeness.
Prescriptive
Owner requiring specific products or methods be instituted by DB team in order to
achieve desired performance.
False
T/F Detailed estimating is the Building systems approach to estimating
False
T/F feasibility estimate is cost model and establishes budget for project
True
T/F key element of quality assurance is keeping communication lines open between
owner and DB
True
T/F in Design/cost relationship of DB, the constructor establishes design parameters for
architect
False
T/F trust is most important thing for DB
Schematic estimating
DB estimating sequence where 15%-20% of design is completed
Trend logs
Provides baseline budgets and schedules and list estimate trends
Committed Design
Drawings and specs are approved by DOR and confirmed within budget
Coordinating owner design reviews and approvals
What is NOT a design managers role?
Design Build Team
Who is responsible for ensuring quality assurance?
Direct DB
When programming and design is developed by DB entity
Spearin Doctrine

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller magdamwikash23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81531 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart