100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
Mass oil burner / NFPA 31 & NORA Exam Questions and Answers $12.99
In winkelwagen

Tentamen (uitwerkingen)

Mass oil burner / NFPA 31 & NORA Exam Questions and Answers

 0 keer verkocht
  • Vak
  • Mass oil burner
  • Instelling
  • Mass Oil Burner

Cast iron fittings can be used in heating fuel systems? - Answer- False Tank vent shall terminate - Answer- Within 12 feet of the fill and visible from the fill Tanks exceeding 330 gallons must have - Answer- Top supply connection Fuel return piping from an appliance shall - Answer- Enter ...

[Meer zien]

Voorbeeld 2 van de 13  pagina's

  • 29 mei 2023
  • 13
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • Mass oil burner
  • Mass oil burner
avatar-seller
Gordones22
Mass oil burner / NFPA 31 & NORA Exam
Questions and Answers
Cast iron fittings can be used in heating fuel systems? - Answer- False
Tank vent shall terminate - Answer- Within 12 feet of the fill and visible from the fill
Tanks exceeding 330 gallons must have - Answer- Top supply connection
Fuel return piping from an appliance shall - Answer- Enter the top of the tank
Oil appliances burning used oil shall only be installed - Answer- In commercial or industrial occupancies
Technician must be present for filling of new oil tank - Answer- False
A common tank vent pipe shall be - Answer- One pipe size larger than the largest individual vent pipe connected to it
If oil supply piping is not visible for inspection you must - Answer- Pressure or vacuum test the line
Installation instructions for the care and operation of the appliance must be posted - Answer- True
Oil burning appliances shall have - Answer- Limit control for pressure in steam, temperature in water boiler, and temperature in furnace
Above ground tank installed inside must be pitched - Answer- Torwards the supply at a pitch of 1/4 inch per foot
Outdoor tanks must be located - Answer- Five feet from property line for 275g or smaller, ten feet for more than 275 but not exceeding 660g. Must be on concrete slab
A chimney connector shall maintain a pitch or rise of - Answer- 1/4 inch per foot
Minimal gauge thickness for steel flue pipe connectors less than nine inches in diameter
- Answer- 26 gauge
Oil fired water heater must be equipped with water temp, pressure, and vacuum relief device - Answer- True
Tank vent piping shall be - Answer- Pitched forward tank, terminate two feet minimum from building openings, corrosion resistant weatherproof cap Direct vent systems shall terminate - Answer- 4 feet horizontally from a building opening
Fuel can be transferred from tank to appliance by pressurizing the tank - Answer- False
Fusible link safety shutoff valves shall be located - Answer- Within six inches of the filter
between the tank and filter
Before installation of new oil burner you are required to - Answer- Inspect the combustion chamber
A crankcase oil burner can be installed in any location where a standard oil burner was located - Answer- False
Can tanks be installed in garages - Answer- Yes, if protected from vehicle impacts by barriers
Teflon tape can be used on oil lines - Answer- False
The trial for ignition period for oil burners less than 20 GPM is? - Answer- 15 seconds
Fusible switches shall operate at a temp of - Answer- 165F
A masonry chimney needs a metal liner - Answer- False
Any valves used on oil burner installation must be a - Answer- Fusible valve
What form is used to pull an oil burner permit - Answer- Form 1
What size pipe is used to cross connect tank outlet piping - Answer- 1/2 inch
What is an oil safety valve required - Answer- On existing installations when a burner, boiler, furnace or tank is replaced
When must you install a draft regulator - Answer- When not exempted by the manufacturer
As of January 1 2014, max safety timing for an oil burner safety switch must be no more
than - Answer- 15 seconds
What type of boiler must be equipped with low water cut off - Answer- Water boilers over 400,000 BTU, all steam boiler
What device must be equipped with air proving switch - Answer- A draft inducer
New burner controls must be - Answer- Interrupted ignition

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Gordones22. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor $12.99. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 64670 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
$12.99
  • (0)
In winkelwagen
Toegevoegd