IBWA CPO Exam Study Set - Chapter 5 A+ RATED 2023|2024 UPDATE
BWA CPO Exam Study Set - Chapter 5 Already Passed _______________________ of product provides the final safeguard of the water's quality Packaging Packaging includes these four procedures: - Handling of containers/closures - Sanitation of bottles and care of bottle washer - Filling containers - Coding bottles with date of production _______________ includes the handling of containers/closures, sanitation of bottles and care of bottle washer, filling containers, and coding bottles with date of production Packaging The 6 Steps of Receipt & Inspection of Packaging Materials: • Inspect the raw materials for any damage that may have occurred during shipment • Inspect the trailer for any signs of insects, trash, or filthy conditions that could contaminate the raw materials • Document the amount received • Always document the lot number/numbers received. All packaging materials must have a lot number • Read the cap and/or bottle labels to ensure that they are correct. Compare your labels to a standard every time • Develop your own packaging material receipt and inspection form to document all information for each type of packaging mat
Written for
- Institution
- IBWA CPO
- Course
- IBWA CPO
Document information
- Uploaded on
- September 2, 2023
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ibwa cpo exam study set chapter 5