100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SCO summary, H6, 10, 12-14 $7.27   Add to cart

Summary

SCO summary, H6, 10, 12-14

1 review
 128 views  0 purchase
  • Course
  • Institution
  • Book

Summary of the book Operations and Supply Chain Management (Jacobs and Chase, fourth edition). The summary is written in English.

Preview 1 out of 14  pages

  • No
  • H6, 10, 12-14
  • June 15, 2017
  • 14
  • 2016/2017
  • Summary

1  review

review-writer-avatar

By: jasperhoogendoorn • 5 year ago

avatar-seller
HOOFDSTUK 6: MANUFAC TURING PROCESSES

What is required to make something? Sourcing the parts we need, followed by making the item and then
sending the item to the customer.

Lead time is the time needed to respond to a customer order. Customer order decoupling point is where
inventory is positioned in the supply chain. Selection of CODP’s is a strategic decision that determines customer
lead times and can greatly impact inventory investment. The closer it is to the customer, the quicker the
customer can be served.

 Make-to-stock is a production environment where the customer is served “on-demand” from finished
goods inventory. (televisions, clothing)
 Assemble-to-order is a production environment where pre-assembled components, subassemblies,
and modules are put together in response to a specific customer order. (Dell)
 Make-to-order is a production environment where the product is built directly from raw materials and
components in response to a specific customer order. (Boeing)
 Engineer-to-order is when the firm works with the customer to design the product, which is then
made from purchased material, parts and components.

Many make-to-stock firms and also assemble-to-order firms invest in lean manufacturing programs in order to
achieve higher service levels for a given inventory investment. These exist to achieve high customer service
with minimum levels of inventory investment.

A simplified way of thinking about material in a process is that it is in one of two states: material is moving/”in-
transit” or material is sitting in inventory and is acting as a “buffer” waiting to be used. Material that is in a
manufacturing process in a factory can also be considered in-transit: “work-in-progress” inventory.

A common measure is the total average value of inventory in the process. This is the total investment in
inventory at the firm, which includes raw material, work-in-process, and finished goods. A better measure is
inventory turn, which is an efficiency measure where the cost of goods sold is divided by the average inventory
value (higher is better). A measure directly related is days-of-supply, which is a measure of the number of days
of supply of an item. Simple systems can be analysed quickly using Little’s law: mathematically relates
inventory, throughput and flow time. Inventory = throughput rate * flow time. Throughput is the long-term
average rate that items are flowing through the process. Flow time is the time that it takes a unit to flow
through the process from beginning to end.

The most common assembly line is a moving conveyor that passes a series of workstations in a uniform time
interval: workstation cycle time (the time between successive units coming off the end of an assembly line).
The total work to be performed at a workstation is equal to the sum of the tasks assigned to that workstation.
The assembly-line balancing problem is one of assigning all tasks to a series of workstations so that each
workstation has no more than can be done in the workstation cycle time and so that the unassigned time
across all workstations is minimized. The precedence relationship is the required order in which tasks must be
performed in an assembly process.

Steps in balancing an assembly line:

1. Specify the sequential relationships among tasks using a precedence diagram.
2. Determine the required workstation cycle time.
𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 𝑝𝑒𝑟 𝑑𝑎𝑦
a. 𝐶 = 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 𝑜𝑢𝑡𝑝𝑢𝑡 𝑝𝑒𝑟 𝑑𝑎𝑦 (𝑖𝑛 𝑢𝑛𝑖𝑡𝑠)
3. Determine the theoretical minimum number of workstations required to satisfy the workstation cycle
time constraint.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller RUGstudent123. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.27. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84251 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.27
  • (1)
  Add to cart