100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Agile Safe 5.1 Final Exam 2 LATEST Versions 60+ Questions AND Answers | Real Exam Questions AND Answers $13.49   In winkelwagen

Tentamen (uitwerkingen)

Agile Safe 5.1 Final Exam 2 LATEST Versions 60+ Questions AND Answers | Real Exam Questions AND Answers

 1 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

Agile Safe 5.1 Final Exam 2 LATEST Versions 60+ Questions AND Answers | Real Exam Questions AND Answers

Voorbeeld 2 van de 14  pagina's

  • 7 september 2023
  • 14
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
Agile Safe 5.1 Final Exam 2 LATEST Versions
60+ Questions AND Answers 2022-2023| Real
Exam Questions AND Answers
1- What does NOT match with Agile Manifesto?
 Process and tools over individuals and interactions
 Working software over comprehensive documentation
 Responding to change over following a plan
 Contract negotiation over customer collaboration



2- Which of the following statements about changing requirements in software
development, are correct?
 In traditional way of software development, once the requirements are base lined, further
changes should undergo heavy change control process
 Changes are acceptable till design but once development starts, any further changes should
be rejected
 In traditional way of software development, once the requirements are base lined, further
changes can be easily accepted with light process
 Organizations must adapt to rapidly changing market conditions to stay relevant in business



3- Which of the following statements BEST describe why Agile is winning?
 Products produced by an Agile approach are cheaper than those produced by any other
approach
 Agile increases the chances of delivering early business value to the market and quickly
incorporate the feedback from the market usage
 Products have faster time to market but may not meet immediate customer needs
 Products are expensive when compared with products produced by other approaches, but
are of top quality.



4- Why were the `practitioners of alternative software development methods` not satisfied
with the traditional waterfall method?
 Waterfall is not a lightweight process
 The practitioners did not like to work in a formal system and hence did not like any
‘methodology’ at all
 Waterfall experience did not add value to their resume
 Waterfall model failed to meet the demand for speed and was not friendly towards changing
business needs and priorities

, 5- Which of the following BEST represent the Scrum approach to planning?
 Planning is a continuous activity done faintly by Scrum Master and Product Owner
 Detailed planning is done upfront and not revisited
 Whole team together does just enough upfront planning followed by continuous
planning throughout the project
 Only planning in Scrum is one of the planning events
6- How should work be allocated to the team in a Scrum project?
 The Scrum Master must assign tasks to individuals
 Team members must volunteer for tasks appropriate to their skills
 The complex tasks must be allocated by the Scrum Master
 Tasks must be allocated to team members by the Product Owner
 While senior team members volunteer for tasks, juniors must be assigned takas by the
Scrum Master



7- The time box for a Daily Scrum is…
 Two minutes per person
 15 minutes
 2 hrs
 No time box
 30 minutes



8- Why is the Daily Scrum held at the same time and same place?
 So that the place can be named as Daily Scrum Hub
 The consistency reduces complexity and overhead
 The Product Owner demands it
 Rooms are hard to book and this helps in advance booking
 There is no such rule



9- What BEST describe a Scrum Team?
 Small but have enough members to create the Product Increment
 Collaborate with each other to self-organize their work
 Team members must be specialists
 Cross Functional
 Reports to Product Owner



10- The Product Owner in a Scrum project….
 Has no control over the prioritization of Product Backlog Items
 Has the final authority over the prioritization of Product Backlog Items
 Collaborates with the developers over prioritization of Product Backlog Items, but the
developers have the final say
 Collaborates with de developers over prioritization of Product Backlog Items but Product
Owner has the final say
 Creates the Product Backlog Items but leaves prioritization to Business Analyst

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper DrTOPNOTCH. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor $13.49. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 67163 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


$13.49
  • (0)
  Kopen