100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

BC Owner Builder Exam | 186 Questions and Answers(A+ Solution guide)

Beoordeling
4.0
(2)
Verkocht
5
Pagina's
16
Cijfer
A+
Geüpload op
23-09-2023
Geschreven in
2023/2024

Order of inspections - 1: forms, basement and crawlspace 2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service 3: plumbing, electrical, mechanical, gas 4: framing inspection 5: insulation and vapour barrier 6: rainscreen/exterior finishs, drywall 7: building envelop inspection 8: final inspection Which is not an acceptable method for determining the correct grading for a trench? - An experienced excavator says it's ok At what depth is shoring required? - 1.2m/4ft Which best describes the principle of rain waterterm-0 deflection? - Design and construction that prevents water from ever entering What lighting safety certifications are required in Canada? - CSA safety certification What grit of sandpaper would get the smoothest result? - Higher grit with get a smoother finish What is the maximum rise in a flight of stairs? - The vertical height of any flight of stairs should not exceed 3.7m What is the minimum distance that a ladder must extend above a parapet wall or landing? - 3ft What heights are end dams to be on windows and door flashings? - 25mm/1 inchEnd dam use - Stop water from coming in When should you call for inspectors to make them efficient as possible? - Group inspectors together when possible and call when work is complete When is an HRV required? - Almost always What can you build under the owner-builder HPO process? - Single detached home under a single title. Single dwelling attached to pre-existing building older than 10 years. Single dwelling attached to a new non-residential building. Who issues permits for a gas fireplace? - Safety Authority (call Technical Safe BC) Can an owner builder take out their own electrical permit? - Yes, up to 200A What is the best way to apply asphalt waterproofing on a foundation? - Spray-on or roll on dry foundation with 2in. below grade When is the appropriate time to backfill a foundation? - After damp-proofing

Meer zien Lees minder
Instelling
BC Owner Builder
Vak
BC Owner Builder

Voorbeeld van de inhoud

BC Owner Builder Exam Order of inspections - ✔✔ 1: forms, basement and crawlspace 2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service 3: plumbing, electrical, mechanical, gas 4: framing inspection 5: insulation and vapour barrier 6: rainscreen/exterior finishs, drywall 7: building envelop in spection 8: final inspection Which is not an acceptable method for determining the correct grading for a trench? - ✔✔ An experienced excavator says it's ok At what depth is shoring required? - ✔✔ 1.2m/4ft Which best describes the principle of rain waterte rm-0 deflection? - ✔✔ Design and construction that prevents water from ever entering What lighting safety certifications are required in Canada? - ✔✔ CSA safety certification What grit of sandpaper would get the smoothest result? - ✔✔ Higher grit with get a smoother finish What is the maximum rise in a flight of stairs? - ✔✔ The vertical height of any flight of stairs should not exceed 3.7m What is the minimum distance that a ladder must extend above a parapet wall or landing? - ✔✔ 3ft What heights are end dams to be on windows and door flashings? - ✔✔ 25mm/1 inch End dam use - ✔✔ Stop water from coming in When should you call for inspectors to make them efficient as possible? - ✔✔ Group inspectors together when possible and call when work is complete When is an HRV required? - ✔✔ Almost always What can you build under the owner -builder HPO process? - ✔✔ Single detached home under a single title. Single dwelling attached to pre -existing building older than 10 years. Single dwelling attached to a new non -residential building. Who issues permits for a gas fireplace? - ✔✔ Safety Authority (call Technical Safe BC) Can an owner builder take out their own electrical permit? - ✔✔ Yes, up to 200A What is the best way to apply asphalt waterproofing on a foundatio n? - ✔✔ Spray -on or roll on dry foundation with 2in. below grade When is the appropriate time to backfill a foundation? - ✔✔ After damp -proofing What do you need to do when applying a peel and stick waterproof membrane foundation? - ✔✔ Use an approved prime r before installing What are gas meter installation requirements? - ✔✔ The distance from the gas vent to the roof must be greater than the overhang of the roof, nothing can be with in 1m either side or 4.5m above a gas meter When do you need to install a handrail or have fall protection? - ✔✔ 10ft, 4ft if no fall protection How high does a construction fence around a site need to be? - ✔✔ 6ft When installing the footer, it was dug down 2in. deeper than what the elevation should be. What needs to happen? - ✔✔ Install the footing form at proper elevation and fill with extra concrete When installing flashing for a roof valley how much do the asphalt shingles need to overlap? - ✔✔ 6in. What would cause a blister on a flat roof? - ✔✔ Moisture trapped under roof Water is backing up in a skylight, what do you do to fix it? - ✔✔ Clear drainage What needs to be done first when starting to install asphalt shingles on a roof? - ✔✔ Install eve protection What kind of fastener can you use in a wood that has been treated with chromated copper arsenate? - ✔✔ Lumber manufacturer approved fastener When should there be insulation under a basement slab? - ✔✔ When there is in floor heating How deep should the control joint be in a concrete slab? - ✔✔ 1/4 of the slab What kind of insulation should be installed under slab? - ✔✔ XPS What kind of insulation has the least moisture permeability? - ✔✔ XPS When framing a header of a staircase where does the framer get the nailing pattern? - ✔✔ Use the BC code section 9 nailing pattern What document must the owner submit to WorkSafe BC prior to starting construction? - ✔✔ Notice of project

Geschreven voor

Instelling
BC Owner Builder
Vak
BC Owner Builder

Documentinformatie

Geüpload op
23 september 2023
Aantal pagina's
16
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Beoordelingen van geverifieerde kopers

Alle 2 reviews worden weergegeven
8 maanden geleden

1 jaar geleden

4.0

2 beoordelingen

5
0
4
2
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainarium Delaware State University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1882
Lid sinds
2 jaar
Aantal volgers
1044
Documenten
22695
Laatst verkocht
4 uur geleden

3.8

326 beoordelingen

5
151
4
62
3
55
2
16
1
42

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen