Exam (elaborations)
Plumbing III exam 2023 with 100% correct answers
- Course
- Institution
Offsets in a stack vent installed for the waste stack shall be located a min. Of___ inches above the flood level of the highest fixture. - correct answer -6" (3109.3) Where the developed length of a sump vent is 110', what is the min. Req. vent size for a dump with a sewage pump having a discha...
[Show more]