100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Sos Nerc Prep - Reliability Exam /200 Questions With Verified Answers $8.49   Add to cart

Exam (elaborations)

Sos Nerc Prep - Reliability Exam /200 Questions With Verified Answers

 0 view  0 purchase
  • Course
  • Institution

Sos Nerc Prep - Reliability Exam /200 Questions With Verified Answers

Preview 4 out of 64  pages

  • October 1, 2023
  • 64
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Sos Nerc Prep - Reliability Exam 2023-2024 /200
Questions With Verified Answers
Quiz :The Reliability Coordinator just informed you of a slow time error
correction which will begin at the top of the next hour. Your EMS system will
not let you change your scheduled frequency. Your Frequency Bias Setting is -
100 MW/.1Hz. What action should you take?

A) Increase Net Interchange Schedule by 20 MWs.

B) Inform the Reliability Coordinator that you cannot participate in the time
error correction.

C) Decrease Net Interchange Schedule by 20 MWs.

D) Increase Net Interchange Schedule by 10 MWs. - Answer :A) Increase Net
Interchange Schedule by 20 MWs.

Quiz :A Balancing Authority has a sudden loss of a large block of load in its
area. This loss will be seen instantaneously in the change of which of the
following values?

1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error

A) 4 only
B) 1 & 3
C) 1 & 4
D) 3 & 4 - Answer :C) 1 & 4

Quiz :Metered Data included in the calculation of ACE are: dynamic schedules,
pseudo ties, actual frequency, and all __________.

A) Tie lines readings
B) Generators output
C) Scheduled frequency indications
D) Transformer load - Answer :A) Tie lines readings

,Quiz :Balancing Authority A is currently reading a system frequency of 60.00
Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is
+200 MW. If Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz,
what is ACE?

A) -100
B) 0
C) 10
D) 100 - Answer :A) -100

Quiz :A Balancing Authority has a Net Interchange Schedule of -250 MWs from
1200 to 1600 on a summer day. The Net Interchange Actual for those same
hours respectively were -230 MW, -275 MW, -250 MW and -270 MW. What
was the Balancing Authority's Inadvertent Interchange for the 4-hour period?

A) 6 MWs out
B) 25 MWs in
C) 25 MWs out
D) 6 MWs in - Answer :B) 25 MWs in

Quiz :For the ACE equation to work properly, dynamic schedules, pseudo ties,
frequency, and all ________________ must be metered.

A) Generation
B) Communications
C) Transformers
D) Tie lines - Answer :D) Tie lines

Quiz :If the frequency bias setting is set to a less negative value than the
frequency response of a Balancing Authority and a frequency increase is
caused by a sudden loss of load in an external balancing area, what will be the
result?

A) The ACE will be zero and will take no AGC action

B) The ACE will be a negative value and AGC will increase generation

C) The ACE will be a positive value and AGC will lower generation

,D)This will not affect the ACE - Answer :B) The ACE will be a negative value and
AGC will increase generation

Quiz :If the frequency bias setting is less negative than the frequency response
of a Balancing Authority and a frequency decline is caused by a sudden loss of
generation in an external balancing area, what will be the result?

A) The ACE will be a negative value and AGC will increase generation.

B) This will not affect the ACE.

C) The ACE will be a positive value and AGC will lower generation.

D) The ACE will be zero and will take no AGC action. - Answer :C) The ACE will
be a positive value and AGC will lower generation.

Quiz :It is the responsibility of which entity/entities to develop, maintain, and
implement load shedding plans?

A) Transmission Operators and Balancing Authorities

B) Reliability Coordinator

C) Load Serving Entities

D) Balancing Authority - Answer :A) Transmission Operators and Balancing
Authorities

Quiz :A Transmission line is loaded 25% above its SOL. A parallel line is out for
routine maintenance and can be placed in service in 10 minutes. What is the
first step the Operator should take to reduce the line loading?

A)Shed load at the downstream bus.

B) Open the line.

C) Re-Dispatch Generation.

D) Initiate the restoration of the parallel line. - Answer :D) Initiate the
restoration of the parallel line.

, Quiz :As a Transmission Operator, you realize that the voltage level is starting
to decline in the North West part of the system. Which of the following devices
should you, as a Transmission Operator, be able to operate, and/or have
another entity operate to raise the voltage level back to normal in the North
West part of the system?

A) Transformer Underload Tap Changers
B) Shunt Capacitor Banks
C) Generator Reactive Output
D) All answers are correct - Answer :D) All answers are correct

Quiz :Voltage reduction for load relief should be made on the __________.

A) Distribution system
B) Entire Interconnection simultaneously
C) Tie-lines with other Balancing Authority Areas
D) Transmission System - Answer :A) Distribution system

Quiz :Under Frequency Load Shedding (UFLS) is to stabilize the imbalance
between generation and load that has been created by a system disturbance.
This is accomplished by ____________.

A) Tripping generation first
B) Voltage reduction on the distribution system.
C) Shedding all load to arrest frequency
D) Shedding load prior to generation tripping - Answer :D) Shedding load prior
to generation tripping

Quiz :Failure to meet the DCS criteria of recovery within 15 minutes results in
which consequence for a specified time period for the Balancing Authority's
failure to recover?

A) Increased Contingency Reserve requirements
B) Decertification as a Balancing Authority
C) Not allowed to supply regulation services
D) Expulsion from the Reserve Sharing Group - Answer :A) Increased
Contingency Reserve requirements

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller HELLENAH. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$8.49
  • (0)
  Add to cart