100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NERC TOP System Operations Questions with Correct Answers Graded A+

Puntuación
-
Vendido
-
Páginas
21
Grado
A+
Subido en
11-10-2023
Escrito en
2023/2024

NERC TOP System Operations Questions with Correct Answers Graded A+ At what torque angle of operation does power typically begin to flow from the generator to the system? A) 90 degrees B) 60 degrees C) 30 degrees D) 10 degrees -Answer 10 degrees Choose the answer that best describes the operation of a rotor. A) The stationary part of the transmission system. B) A type of superconductor. C) The stationary element of a generator that has its windings connected to the system. D) The excited (energized) field winding that rotates inside the stator to induce current into the stator windings. -Answer The excited (energized) field winding that rotates inside the stator to induce current into the stator windings. In a system that is more capacitive than inductive, the current sine wave will ______ the voltage sine wave with tends to ___________ voltage. A) lag; raise B) lead; raise C) lead; lower D) lag; lower -Answer lead; raise Sustained operation with a power angle or torque angle above ______ can lead to system instability. A) 10 degrees B) 90 degrees C) 120 degrees D) 360 degrees -Answer 90 degrees Which of the following conditions may cause transient instability in the power system? A) When the power angle increases to 90 degrees or more. B) When a disturbance causes momentary power angle excursions greater than 90 degrees. C) When heavy power transfers occur in the system, such as when there is a loss in generation. D) All of the above -Answer All of the above Which of the following is a method that Reliability Coordinators and Balancing Authorities may use to manage transmission outages? A) Coordinate and adhere to voltage schedules to minimize reactive power flow. B) Optimize the use of Load Tap Changer transformers, capacitors, and reactors. C) Verify voltage control equipment are on automatic to supply the required voltage support. D) All of the above -Answer All of the above When a large generator on an Interconnection trips off line, the ____________ of the Interconnection ____________. A) frequency; drops B) transformer temperature; drops C) AVRs; drops D) voltage; increases -Answer frequency; drops A(n) ___________ is the value that satisfies the most limiting of the prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria. A) System Operating Limit B) Circuit Overload C) System Overload Limit D) Interconnection Reliability Operating Limits -Answer System Operating Limit Generator ratings specify the __________ and ___________ at which they can operate safely. A) temperature; voltage B) torque angle; voltage C) System Operating Limits; Interconnection Operating Limits D) voltage; frequency -Answer voltage; frequency

Mostrar más Leer menos
Institución
NERC TOP System Operations
Grado
NERC TOP System Operations










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NERC TOP System Operations
Grado
NERC TOP System Operations

Información del documento

Subido en
11 de octubre de 2023
Número de páginas
21
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Parie Western Governers University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
448
Miembro desde
3 año
Número de seguidores
368
Documentos
3318
Última venta
2 semanas hace
A+ Score for your exams, cats and assessments. Email if you want your assignments, essays and other school projects done for you at fair and negotiable prices.

100% Money Back Guarantee Immediately available after payment Both online and in PDF No strings attached

3.9

82 reseñas

5
37
4
18
3
16
2
2
1
9

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes