Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

LARE Exam Prep Session 1Questions &Answers 100% Correct

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
17-10-2023
Written in
2023/2024

LARE Exam Prep Session 1Questions &Answers 100% Correct LARE Exam Prep Session 1Questions &Answers 100% Correct LARE Exam Prep Session 1Questions &Answers 100% Correct LARE Exam Prep Session 1Questions &Answers 100% Correct The process of beginning a project involves an introductory phase wherein the owner presents explicit descriptive specifications for the proposed undertaking. Rather than simply indicate interest without nuance, and to avoid issuing irresponsible considerations for multiple projects, a contractor is required to submit a ______ to express their specifications (including designs and price) for the planned construction. - ANSWERA bid is an expression of plans and terms specific to the job at hand. It can be comprised of numerous procedural components, including the invitation to bid, instructions to bid, a detailed bid form, and assorted bonds, all designed for that precise job. Shop drawings are a graphical representation of the project at hand, detailing the proposed construction. A notice of award is a written communication from the owner to a contractor, signaling that they have achieved the winning bid. A remand is a legal term reflecting the redirection of a course case to a lower court for ruling, and is unrelated to this bid process. What information would not be found in the instructions to bidders? - ANSWERThe instructions to bidders will not include a copy of the site plans. They will include the start date of the project, the time and place to submit bids and any product substitution information. What is the role of CLARB? Select all that apply. A. To set the minimum requirements to become licensed in each state B. To compile records of professionals C. To work in conjunction with ASLA to produce the LARE D. To provide services, which examine the competency of each candidate - ANSWERCLARB's role is to assist state registration boards, compile professional records and develop the LARE. CLARB also provides services, which tests the examinees and provides the results to each individual state board. It does not set the minimum requirements that each state must require in order to become licensed. It is also an independent body and does not work in conjunction with ASLA in developing the LARE. An owner may terminate a contract if? (Select all that apply) A. The contractor has gone bankrupt B. A contractor is working too slowly C. The contractor fails to pay the subcontractors D. The contractor persistently disregards local ordinances - ANSWERA contract can be terminated for any of the following reasons: breach of contract, fraud, nonpayment of professional fees, hazardous site conditions, failure to pay subcontractors, a contractor goes bankrupt and the contractor violates ordinances intentionally. Phillip runs a small Landscape Architecture fi rm. His college roommate Desmond runs a medium sized Architecture fi rm. Desmond has decided that he would like his company to go after larger government work and needs a Landscape Architecture fi rm to get the work. He asks Phillip to permanently join together their two companies, but Phillip has some reservations and would like to try it out on a short term basis. What type of company should the two friends form? - ANSWERA joint venture is the partnership of two different firms for the length of a project or a set amount of time. This type of business allows the two companies to share resources, combine expertise and capital. The partnership will expire after a specified amount of time. Corporations and partnerships are more of a long term approach to a business venture and a sole proprietorship does not include any agreement of ownership between multiple parties. It is a business run by a single individual. In order to begin using a building after all of the work has been completed, what must be obtained from the local municipality? - ANSWERIn order to be able to move into a property or begin using it again, a certificate of occupancy is needed from the local building department. This states that the building complies with all local codes and is in condition to be occupied. What type of specifi cations instruct the contractor on where to deliver and store all of the materials on site? - ANSWERThe general specifications are designed to instruct a contractor on what is required during the project including where to deliver and store materials, the description of the work to take place and the sequence of work. The technical specifications provide details on the different items that are going to be

Show more Read less
Institution
LARE
Course
LARE










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LARE
Course
LARE

Document information

Uploaded on
October 17, 2023
Number of pages
23
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
LARE SECTION 1,2,3 &4- PROJECT MANAGEMENT EXAM STUDY BUNDLE| QUESTIONS AND ANSWERS 100% VERIFIED
-
26 2023
$ 303.74 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1675
Member since
3 year
Number of followers
1073
Documents
18137
Last sold
1 day ago
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

456 reviews

5
215
4
79
3
91
2
21
1
50

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions