100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
ACI Concrete Field Testing Technician - Grade I Exam Questions & Answers $8.49   Añadir al carrito

Examen

ACI Concrete Field Testing Technician - Grade I Exam Questions & Answers

 2 vistas  0 veces vendidas
  • Grado
  • Institución

ACI Concrete Field Testing Technician - Grade I Exam Questions & Answers

Vista previa 2 fuera de 5  páginas

  • 22 de octubre de 2023
  • 5
  • 2023/2024
  • Examen
  • Preguntas y respuestas
avatar-seller
ACI Concrete Field Testing Technician -
Grade I Exam Questions & Answers
The end of the temperature sensing portion of the temperature measuring
device is submerged a minimum of __mm [__in.] into the freshly mixed
concrete. - -77mm /3in.

-The temperature measuring device shall be capable of accurately
measuring the temperature of freshly mixed concrete to +- __C [+__F]
throught a range of __. - -0.5 C / +-1F / 0-50 Decrees C

-The temp. measuring device shall be verified __, or whenever there is a
question of __. - -Annually / accuracy

-The temp of concrete may be measured in a wheelbarrow? T/F - -True

-The temp. of concrete may be measured in a wall form. T/F - -True

-A composite sample of concrete is required even if the only purpose for
obtaining the sample is to determine temp. T/F - -False

-What must be done to the sample container prior to sampling the concrete
- -It must be dampened with water

-What must be done to the concrete surrounding the temp measuring device
after the device is submerged in the fresh concrete? - -Gently press the
concrete at the surface around the measuring device.

-How long must the temperature measuring device remain in the freshly
mixed concrete? - -At least 2 min., no longer than 5 min.

-After the temperature of the concrete is read, what is then required? - -
Reporting of temp.

-The temp. of concrete is reported to the nearest __. - -1 degree F

-According to ASTM C1064, what is one reason to take the temperature of
concrete? - -to verify conformance to a specific requirement.

-A max. temp. of freshly mixed concrete is specified in ASTM C1064. T/F - -
False

-The sample of concrete used for temperature determination must be
rodded 25 times. - -False

, -Sampling by this method covers procedures or obtaining representative
samples, on which test are to be performed to determined __ with quality
requirements of the specifications under which the concrete is furnished. - -
Compliance

-This method covers sampling from four types of mixers, which are __, __, __,
and __. - -Stationary mixers / Paving mixers / revolving drum mixers / open
top mixers

-The elapsed time between obtaining the first and final portions of a
composite sample shall not exceed __ min. - -15 min.

-Portions of a composite sample shall be thoroughly mixed before beginning
test on the sample. T/F - -True

-Start tests for slump, temp, and air content within __ min. after obtaining
the final portion of the composite sample. - -5 min.

-start molding specimens fr strength tests within __ after fabrication the
composite sample. - -15 min.

-The concrete sample must be protected from contamination and __. - -
Rapid evaporation

-The maximum size sample for making strength test specimens is __ ft
cubed - -1 foot cubed.

-When sampling from a STATIONARY mixer, the batch must be sampled at __
or more regularly spaced intervals during discharge of the middle portion of
the batch. - -2

-When sampling from a PAVING mixer, obtain samples from at least __
different portions of the pile and combine them into one composite sample
for test purposes - -5

-When sampling from a REVOLVING DRUM TRUCK mixer, sample the
concrete by collecting __ or more portions taken at regularly spaced intervals
during discharge of the middle portion of the batch. - -2

-Concrete samples from a truck mixer will be obtained before any water or
admixtures are added to the mixer at the job site. T/F - -False

-The composite sample from a truck mixer must be obtained from the __
portion of the batch. - -Middle.

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victorious23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $8.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender

Vistos recientemente


$8.49
  • (0)
  Añadir