Exam (elaborations)
IDPX NCIDQ Prep Exam 2023 /2024 with 100% correct answers
- Course
- Institution
Why does the HVAC system need to be balanced at the end of a commercial project? A. To verify that air quality levels are within the design specifications B. To detect significant air leaks in ductwork C. To adjust air flow at each device location to meet the criteria in the engineer...
[Show more]