BECC Mod 2 question n answers rated A+ 2023/2024
BECC Mod 2How long are engineering legal records retained onboard for? - correct answer 3 years How long are operational logs maintained for? - correct answer 6 months what is the record where all speed changes for each individual shaft are recorded? - correct answer bell book what log is maintained in dc central - correct answer damage control closure log What log records day to day events in the engineering plant - correct answer the engineering log responsible for physical security of the main reduction gear? - correct answer engineer officer watch fire and flooding get reported to - correct answer sounding and security watch in port watch in charge of physical security of the ship and takes control of security forces - correct answer CDO What program is used to safeguard the ship from sabotage? - correct answer physical security program What device is a positive stop used to prevent inadvertent manipulation? - correct answer a locking device the use of EOSS is - correct answer mandatory What are the 3 parts of an EOSS? - correct answer the EOSS users guide, EOP, EOCC What 2 actions of the EOCC that must be memorized - correct answer controlling and immediate actions 4 actions EOCC - correct answer controlling, immediate, supplementary, restore casualty used to alert personnel to an action that if not strictly adhered to may result in injury to personnel - correct answer warning who uses master plant procedures - correct answer EOOW, OOD, SPACE SUPERVISOR table that displays proper valve alignment for various tanks - correct answer tank tables What part of EOP provides tank capacities - correct answer tank status diagram What document provides standardized procedures tailored to each ship - correct answer EOSS What chart helps keep track of what equipment is on line - correct answer status chart why is oil in bilges considered hazardous - correct answer generate vapors that can ignite with a spark or open flame parts per million of oily waste that is sufficient to cause a sheen - correct answer 15-20 Mark 2 spill kit location - correct answer main deck complete discontinuation of all discharges of oily waste - correct answer OPA
Written for
- Institution
- BECC
- Course
- BECC
Document information
- Uploaded on
- December 7, 2023
- Number of pages
- 22
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal