NERC Prep - Bal, Int, & Trans Test Questions with Correct Answers Graded A+
What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group -Answer b. NERC Operating Committee What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE that the transmission path is out of service -Answer c. Check targets and equipment For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency calculations, and all ________ must be metered. a. Communications b. Transformers c. Tie Lines d. Generation -Answer c. Tie Lines
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- December 29, 2023
- Number of pages
- 18
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc prep bal int trans test questions with
Also available in package deal