First Class Steam License with verified solution 2023/2024
First Class Steam Licenseif the boiler is generating 20,000 lb/hr of steam, it must be supplied with ________ lb/hr of feedwater - correct answer 20,000 from the deaerator, oxygen and other noncondensable gases are separated from the feedwater and directed to the atmosphere _________ - correct answer through the vent a(n) ___________ system is a system of measuring instruments and controllers that work together to control a process - correct answer controll one pound of water is needed to produce ________ of steam - correct answer 1lb in a low-pressure gas system, the ________ valve is an electric valve that cannot be opened until the gas pilot is lit - correct answer manual reset ______ are used for loads that require dry steam, such as turbines - correct answer superheaters in a feedwater system, the ________ valve is located close to the shell of the boiler on the feedwater line so that the check valve can be repaired without draining (dumping) the boiler - correct answer stop a steaming boiler can have the water in the gauge glass go from half full to empty in a matter of ________ if water is not added to the boiler - correct answer minutes in a fuel oil system, the purpose of duplex strainers is to _________. - correct answer permit one strainer to be cleaned while the other is in service superheated steam has more _______ than saturated steam at the same pressure. - correct answer heat energy
Geschreven voor
- Instelling
- MN Boiler License
- Vak
- MN Boiler License
Documentinformatie
- Geüpload op
- 31 december 2023
- Aantal pagina's
- 15
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
Ook beschikbaar in voordeelbundel