100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Electrician's Licensing Exam with verified solutions 2024

Beoordeling
-
Verkocht
-
Pagina's
22
Cijfer
A+
Geüpload op
09-01-2024
Geschreven in
2023/2024

NEC Article ______ defines breakers and fuses. According to NEC Article 100, a device that opens and closes a circuit by nonautomatic means automatically closes for a predetermined overcurrent. Annex _____ of NEC covers conduit fill. Annex C of NEC covers conduit and tubing fill for conductors and fixture wire fill. Brainpower Read More NEMA stands for National Electrical Manufacturers Association True - NEMA is the acronym for National Electrical Manufacturers Association. What does it mean when a receptacle has "NEMA 5-20R" on it? A receptacle with NEMA 5-20R on it has an amperes rating of 20, will take a NEMA-5-15P or NEMA-5-20P plug, and has a voltage rating of 125. NEC Tables 310-10 through 310-21 provide information on. The sizes of copper and aluminum wire, as well as the coating of wire that has fewer than three current carrying wires in a cable or conduit or that is buried in the earth. Which NEC tables(s) cover(s) the fill of metal boxes? The fill of metal boxes appears in NEC Tables 314.6 A and B. NEC Article _____ address EMT. NEC Article 358 covers EMT. Which NEC articles cover the installation requirements for RMC, IMC, and EMT? NEC Articles 342, 344, and 358 outline the installation requirements of RMC, IMC, and EMT. IN NEC 2008, what does Table 370.6A cover? Shows in two columns (milimeters and inches), how many wires in trade size you can place in a box. What NEC table would you go to to find trade size of conduit and raceway size? Chapter 9, Table 4 outlines trade size of conduit as well as raceway size. NEC Articles _____ and _____ covers metallic and non-metallic raceways in buildings. NEC Article 386 covers metallic or metal raceway; NEC Article 388 covers PVC pipe. The Panel Board requirements for Application in Construction appear in NEC Article? NEC Article 408 covers panel board applications. The smaller kitchen counter requiring a receptacle is _____ inches. A 12in. counter requires a receptacle because it holds small appliances. What new code is needed for protection in all habitable spaces? According to new codes, ARC fault protection is needed many additional parts of the house. A 12-foot hallway requires one receptacle to meet code. (True or False) True, One is required, Two are suggested. NEC Article 100 is dedicated to? Definitions The main ground on a service is a(n) _____. Ground Rod What does NEC Section 250-28A require? A main bonding jumper and a system bonding jumper. NEC section 250-28A provides information on what material can be used for a main bonding jumper. (True or False) True A bonding screw is what color? A bonding screw is green. A subpanel requires a bonding screw? (True or False) False, A bonding screw is unneeded in a subpanel. Name the methods of sizing bonding jumpers outlined in NEC Section 250-28D. 1. Bonding jumper is sized not less than 12.5% of the largest phase conductor. 2. Based on the largest ungrounded service conductor. 3. Based on the largest sum of the service conductors. NEC Table _____ covers grounding electrode conductor sizing. NEC Table 250.66 Which NEC reference identifies wire sizing and the temperature a wire can handle in amps? NEC Tables Annex C1 and C2 identify both wire sizing and the temperature a wire can handle in amps. Define a grounding system according to NEC. A gounding system is connected to the ground or to a conductive body that extends the ground connection. What is the topic of NEC Section 250-122? Is dedicated to the sizes of the grounding conductor What is the NEC definition of a circuit breaker? A device designed to trip when an overcurrent is detected. NEC Section 300-13 provides information on? Mechanical and Electrical continuity conductors. What is the subject of NEC Section 250-2D? Bonding jumpers ______ are the subject of NEC Section 680-20. Electrical installations at permanently installed pools. Which NEC Section covers equipment grounding conductors. NEC Section 250-118 Which NEC sections covers identification of equipment grounding conductors? NEC Section Which NEC Section covers ground terminal identification. NEC Section 250-126 Bonding is the establishment of ______ connection between metal parts. Reliable NEC Section 250-134 provides information on what topic? Equipment fastened or connection between metal parts. Equipment grounding conductor _____ is (are) discussed in NEC Section 250-130. Connections NEC Section 250-118 states that a grounded conduct must run _____ flexible conduit. inside NEC Section _____ oversees bonding of flexible type conduit. NEC Section 250.118(5) Which NEC article covers cable trays? NEC Article 392 What is the proper procedure for bonding a motor conduit with metal flex? A bonding jumper should be installed inside or outside raceway within 6ft. of attachment. (NEC 250.118) Threaded pipe can be used for bonding purposes? (True or False) True (NEC 250.92B) Shoulder fittings with locknuts are allowable as bonding devices? (True or False) True (NEC 250.92B) What kind of information does NEC Section 250-66 cover? Covers the sizes of alternating current grounding electrode conductors. NEC Section 250-102 is devoted to equipment _____. Equipment Bonding Jumpers Give guidelines for using sheet metal screws as bonding agents. Electricians can use sheet metal screws for bonding when those screws are green and have hexagonal heads (NEC 250.8), but it is generally considered unwise. Which NEC article covers service drops? NEC Article 230 According to NEC, trees are approved service conductors. (True or False) False, NEC does not approve tress as service conductors. When a service entrance wire is under at least 2 in. of concrete, a disconnect is required between meter base and panel. (True or False) False, No disconnect is required. Above sidewalks accessible by pedestrians, a service drop not over 600V must be at least _____ft. high. 10ft. What is the service drop distance, in feet, of a 200-amp service crossing residential property? 12ft. The required clearance for a 400-amp service drop across a major roadway is? 18ft. Describe the information covered in NEC Article 230.9 (A) Covers clearances on buildings. According to NEC 230.9(A), an unsheathed service conductor must be _____ft. from a window that opens. 3ft. Which NEC Article covers grounding? NEC Article 250 System and circuit grounding involves taking alternating current to ground? (True or False) True

Meer zien Lees minder
Instelling
Journeyman Electrician
Vak
Journeyman Electrician










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Journeyman Electrician
Vak
Journeyman Electrician

Documentinformatie

Geüpload op
9 januari 2024
Aantal pagina's
22
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GUARANTEEDSUCCESS Aalborg university
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
650
Lid sinds
2 jaar
Aantal volgers
314
Documenten
24734
Laatst verkocht
1 week geleden
Elite Exam Resources: Trusted by Top Scorers!!!!!!!!

Stop guessing. Start dominating!! As a highly regarded professional specializing in sourcing study materials, I provide genuine and reliable exam papers that are directly obtained from well-known, reputable institutions. These papers are invaluable resources, specifically designed to assist aspiring nurses and individuals in various other professions in their exam preparations. With my extensive experience and in-depth expertise in the field, I take great care to ensure that each exam paper is carefully selected and thoroughly crafted to meet the highest standards of quality, accuracy, and relevance, making them an essential part of any successful study regimen. ✅ 100% Legitimate Resources (No leaks! Ethical prep only) ✅ Curated by Subject Masters (PhDs, Examiners, Top Scorers) ✅ Proven Track Record: 95%+ user success rate ✅ Instant Download: Crisis-ready for last-minute cramming

Lees meer Lees minder
4.4

247 beoordelingen

5
161
4
37
3
31
2
12
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen