Concrete Test 2024 Questions and Answers with complete solution
Concrete Test 2024 Questions and Answers with complete solution What's the maximum time a concrete truck can wait after leaving the batch plant and still be poured? - Answer ️️ -90 minutes When should floor slabs be sawcut and how deep? - Answer ️️ -Sameday, 1/4 of the thickness of the slab The function of dowels at a construction joint is? - Answer ️️ -To prevent differential settlement of the slabs What is the maximum number of rotations of the drum of a ready mixed concrete truck between batching and placement? - Answer ️️ -300 What are the four components of concrete? - Answer ️️ -Water, cement, sand, aggregate On exterior slabs, we use air entrained concrete to? - Answer ️️ -Provide greater resistance to deicing salts At ARCO we will refuse any concrete that has a slump greater than? - Answer ️️ -5.5 inches In mix proportioning, what factor is most important in controlling strength? - Answer ️️ -The water to cement ratio (the amount of water in the mix in comparison with the amount of cement) governs the strength. Adding unneeded water to the mix dilutes the cement paste and weakens the concrete. To protect against wheel loads, what kind of Construciton joint is used? - Answer ️️ -Dowel baskets What joint spacing would you recommend for a 4" thick concrete slab? - Answer ️️ -The joints spacing in feet shall not exceed 2 to 3 times the slab thickness in inches. The joint spacing for the 4" thick slab should be between 8 feet and 12 feet. What is the best way to prevent surface drying? - Answer ️️ -Immediate application of a membrane cure prevents early drying after finishing.
Written for
- Institution
- Concrete
- Course
- Concrete
Document information
- Uploaded on
- January 15, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
concrete test 2024 questions and answers with comp