CSA A23.2-19C (Slump Flow) Exam with Answers
The maximum nominal size of aggregate in a concrete sample that is appropriate when a slump flow test is to be performed is. Mm - 28 When the concrete contains aggregate larger than allowed in the Slump flow test must be performed, what must be done to the concrete sample - It must be wet sieve over 28 mm sieve The requirements for the test specimen mould when performing the slump flow test are the same as. With the exception. Of. Which are not mandatory for this test method - The slump test, the 2 foot pieces The minimum Slump flow board dimensions are - At least 800 mm² The slump flow test must be completed within. Minutes of obtaining the sample including transportation and mixing - 10
Escuela, estudio y materia
- Institución
- CSA
- Grado
- CSA
Información del documento
- Subido en
- 25 de enero de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
csa a232 19c slump flow exam with answers
Documento también disponible en un lote