Exam (elaborations)
Plumbing Level 1 Module 1 Questions with 100% Correct Answers
- Course
- Institution
Aboveground rough-in Correct Answer The second phase of a plumbing project. During this phase, holes are cut in walls, ceiling, and floors. Then, supply and waste pipes are attached or hung so they can be connected to fixtures. Also, referred to as stack out, top out, or in-wall rough-in. Appurt...
[Show more]