Chapter 4: Planning Capacity
Capacity = The maximum rate of output of a process or a system
Planning Long-Term Capacity
Long-term capacity plans deal with investments in new facilites and equipment at the
organizatonal level and require top management partcipaton and approval because they
are not easily reversed. These plans cover at least two years into the future, but
constructon lead tmes can sometmes be longer and result in longer planning tme
horizons.
Measures of Capacity and utilization
- Output measures of capacity : best utlized when applied to individual processes
within the frm or when the frm provides a relatvely small number of standardized
services and products.
- Input measures of capacity : generally used for low-volume, fexible processes, such
as those associated with a custom furniture maker.
Utilizatiion = The degree to which equipment, space, or the workforce is currently being
used, and is measured as the rato of average output rate to maximum capacity (expressed
as a percent).
= Average output rate / Maximum capacity X 100%
Economies of Scale
Ecioniomies iof scale = A concept that states that the average unit cost of a service or good
can be reduced by increasing its output rate.
Four principal reasons explain why economies of scale can drive costs down when output
increases:
1. Fixed costs are spread over more units.
2. Constructon costs are reduced.
3. Costs of purchased materials are cut.
4. Process advantages are found.
Diseconomies of Scale
Disecioniomies iof scale = Occurs when the average cost per unit increases as the facility’s
size increases.
Capacity Timing and Sizing Strategies
Three dimensions of capacity strategy before making capacity decisions:
1. Sizing Capacity Cushions
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller femkeaa. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $3.75. You're not tied to anything after your purchase.