100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
Previously searched by you
NICET LEVEL 2 FULL LATEST EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS|GRADED A+ How often should the placement of concrete for structures be inspected? A. Upon delivery B. After installation C. Once a week D. During the placement process - ANS$9.49
Add to cart
NICET LEVEL 2 FULL LATEST EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS|GRADED A+ How often should the placement of concrete for structures be inspected? A. Upon delivery B. After installation C. Once a week D. During the placement process - ANS
5 views 0 purchase
Course
NICET LEVEL 2
Institution
NICET LEVEL 2
NICET LEVEL 2 FULL LATEST EXAM 2024
QUESTIONS AND CORRECT DETAILED
ANSWERS|GRADED A+
How often should the placement of concrete for structures be
inspected?
A. Upon delivery
B. After installation
C. Once a week
D. During the placement process - ANSWER-D. During the placement
proces...
NICET LEVEL 2 FULL LATEST EXAM 2024
QUESTIONS AND CORRECT DETAILED
ANSWERS|GRADED A+
How often should the placement of concrete for structures be
inspected?
A. Upon delivery
B. After installation
C. Once a week
D. During the placement process - ANSWER-D. During the placement
process
What is the primary function of inspecting cast-in-place structural
components?
A. To ensure the proper placement of forms and reinforcing steel
B. To ensure the structural components are properly cast
C. To ensure the concrete meets testing and certification
requirements
D. To ensure the proper delivery and placement method of concrete -
ANSWER-B. To ensure the structural components are properly cast
,What is the primary function of verifying that concrete for structures
meets testing and certification requirements?
A. To ensure the structural components are properly cast
B. To ensure the concrete has the required strength and durability
C. To ensure the forms and reinforcing steel are placed correctly
D. To ensure the proper delivery and placement method of concrete -
ANSWER-B. To ensure the concrete has the required strength and
durability
How often should the testing and certification of concrete for
structures be performed?
A. Upon delivery
B. After installation
C. Once a month
D. Before and after placement - ANSWER-D. Before and after
placement
What is the primary function of inspecting precast box culverts?
A. To ensure proper delivery
B. To ensure proper installation
C. To ensure proper curing
,D. To ensure proper delivery and proper quality of precast box
culverts - ANSWER-D. To ensure proper delivery and proper quality of
precast box culverts
You are inspecting a construction site and notice that the soil appears
to be a fine-grained, cohesive material with good bearing capacity.
What type of soil is this likely to be?
a. Clay
b. Sand
c. Gravel
d. Loam - ANSWER-a. Clay
You are inspecting the clearing and grubbing of a construction site
and notice that a large tree has been removed within the limits of
disturbance. What should you do?
a. Notify the project manager and request that a replacement tree be
planted
b. Document the removal in the construction logs and move on
c. Issue a stop work order until a replacement tree can be planted
d. Request that the tree be replaced, but do not issue a stop work
order - ANSWER-d. Request that the tree be replaced, but do not
issue a stop work order
You are inspecting the placement of an embankment and notice that
the compaction is below the required specification. What should you
do?
, a. Accept the work and move on
b. Notify the project manager and request that the compaction be
corrected
c. Issue a stop work order until the compaction can be corrected
d. Document the issue in the construction logs and move on -
ANSWER-b. Notify the project manager and request that the
compaction be corrected
You are asked to calculate the excavation and embankment
quantities for a construction project. What information do you need
to complete this task?
a. The dimensions of the excavation and embankment areas
b. The weight of the soil and other materials
c. The density of the soil and other materials
d. All of the above - ANSWER-d. All of the above
You are inspecting a construction site and notice that temporary
erosion and sediment controls are not properly installed. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the controls be
corrected
c. Issue a stop work order until the controls can be corrected
d. Document the issue in the construction logs and move on -
ANSWER-c. Issue a stop work order until the controls can be
corrected
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller emilywambura. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.49. You're not tied to anything after your purchase.