BICSI TECHNICIAN EXAM LATEST QUESTIONS WITH 100% CORRECT ANSWERS | 2024 UPDATE
BICSI TECHNICIAN EXAM LATEST QUESTIONS WITH 100% CORRECT ANSWERS | 2024 UPDATE L Rating - Answer ️️ -A firestops ability to provide a smoke stop. (air leakage rate) To avoid damaging cable jacket, how often must you securely fasten electrical nonmetallic tubing (ENT) - Answer ️️ -3 Feet so it does not damage the cable What is the minimum dedicated power requirement of a telecommunications enclosure - Answer ️️ -120 V ac/20 The clearance behind the PBB when mounted, should be no less than- - Answer ️️ -2inch clearance behind the PBB when mounted When installing a plywood backboard, you should use galvanized screws that are a minimum of ______ longer than the depth of the wall covering, including the plywood - Answer ️️ -0.5in The use of under carpet telecommunications cable should be limited to: - Answer ️️ -The interconnection point between horizontal cabling and UTC is a transition point (TP) Two 90-degree bends are allowed in any one conduit segment. A third bend may be acceptable under certain situations - Answer ️️ -Runs under 33 feet When installing racks and cabinets on an access floor, what should they be secured to? - Answer ️️ -The frame When placing cabinets on an access floor, how should the cabinets be aligned? - Answer ️️ - One edge flush with the floor tile cut line What is a telecommunications enclosure TE used for? - Answer ️️ -May be used to provide a suitable option for moves, adds, and changes without compromising infection control measures and other restrictions What size threaded rod would you typically use in a heavy duty ladder rack installation? - Answer ️️ -5/8in A supplemental bonding network within an ER or data center consisting of a set of conductors formed into a grid is often associated with what? - Answer ️️ -Access flooring Which type of anchor requires a hole to be drilled into the floor where the attachment is to be made? - Answer ️️ -Expansion anchors Min seperation from electric motors and transformers? - Answer ️️ -48" During which phase of the project would you determine cable labeling requirements? - Answer ️️ -Pre-construction Phase What type of documentation uses the original floor plans and reflects the actual installed outlet locations, cables, length, and firestopping materials? - Answer ️️ -Record drawings Which project document is used to request clarification, supplemental information, or approval of material substitutions? - Answer ️️ -R
Written for
- Institution
- BICSI
- Course
- BICSI
Document information
- Uploaded on
- February 15, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
bicsi technician exam latest questions with 100 c
Also available in package deal