DBIA Project Delivery Exam Questions with Solutions
3 views 0 purchase
Course
NU1426
Institution
NU1426
DBIA - Project Delivery Exam Questions with Solutions.
Miller Act
Delivery system, Type of Procurement and Type of Contract Format.
Design Bid Build (Low Bid)
The Owner
None
Scheduling Restraints or needs to be fast-tracked
Design Build
Design Build
1 - Joint Venture
2 - Integrated DB F...
DBIA - Project Delivery Exam Questions with
Solutions.
1). Miller act
Ans: The existing federal law that required federal projects exceeding 100k to require
both a performance and a payment bond. Created a legal separation between
construction & Design
2). Delivery system, type of procurement and type of contract format.
Ans: What are 3 fundamental decisions an Owner must make when initiating a feasible
project?
3). Design bid build (low bid)
Ans: What is the most common project delivery system?
4). The owner
Ans: In traditional DBB delivery, who does the architect sign their contract with?
5). None
Ans: What type of relationship does the contractor have with an architect in Design Bid
Build?
6). Scheduling restraints or needs to be fast-tracked
Ans: Why would you choose a Design Build delivery System?
7). Design build
Ans: If the owner wants to shift risk to one party, what project delivery method would
they choose?
8). Design build
PaperStoc.com Page 1 of 7
, Ans: What type of project delivery best suits a complex project requiring close
coordination of design and construction expertise?
9). 1 - joint venture
2 - integrated db firm
3- a/e led
4 - contractor led
Ans: What are some forms of Design Build entities?
10). Yes
Ans: Does the Owner bear risk in a design-bid-build?
11). 1 - linear project delivery
2 - well defined and familiar relationships
3 - benefit of open market competition
4 - owner is actively involved in design until documents are 100% complete
Ans: What are some reasons owners choose DBB?
12). Limiting factors to design build
Ans: 1 - Owner wants absolute design control
2 - The programming limits flexibility and innovation
3 - The Owner cannot provide programming and performance requirements.
13). Contractor led
Ans: The most common DB entity structural arrangement?
14). 1 - contractor
2 - architect
Ans: What contracts does the owner holds in a CM @ Risk delivery method.
15). Qualifications and best price
Ans: How architect/engineering firms are typically selected?
PaperStoc.com Page 2 of 7
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Academik001. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.49. You're not tied to anything after your purchase.