100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!! $21.49   Add to cart

Exam (elaborations)

PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!!

 2 views  0 purchase
  • Course
  • Institution

PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!! Introduction to Power Engineering Introduction to Power Engineering Which of the following is not a definition of a power plant? a) Any one or more boilers in which steam or other vapour is generated at more than ...

[Show more]

Preview 4 out of 116  pages

  • March 8, 2024
  • 116
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
PE 4th Part A ABSA Test Bank Questions With Complete
Solutions Graded To Pass!!
Introduction to Power Engineering
Introduction to Power Engineering
Which of the following is not a definition of a power plant?
a) Any one or more boilers in which steam or other vapour is generated at more
than 103 kPa (15 psi).
b) Any one or more boilers containing liquid and having a working pressure
exceeding 1100 kPa (160 psi).
c) Any one or more boilers containing liquid and having a working temperature
exceeding 121 degrees Celsius (250 degrees Fahrenheit).
d) Any one or more boilers in which steam or other vapour is generated at less
than 57 kPa (8 psi).
e) Any engine run from one or more boilers containing liquid and having a
working pressure exceeding 1100 kPa (160 psi).
d) Any one or more boilers in which steam or other vapour is generated at less than 57
kPa (8 psi).
Early government involvement in certification of power engineers became more
important for the following reasons except:

a) efficiency
b) labour mobility
c) safety
d) pollution
e) technological advancements
d) pollution
Which of the following is not characteristic of increased automation in power
plants?

a) computerized control stations
b) increased mechanization
c) manual flame checking
d) continuous monitoring of processes
e) continuous monitoring of costs
c) manual flame checking
"Power plant" means
a) any one or more boilers in which steam or other vapour is generated at more
than 103 kPa (15 psi).
b) any one or more boilers in which steam or other liquid is generated at more
than 103 kPa (15 psi).
c) any one or more boilers containing liquid and having a working pressure
exceeding 1,200 kPa (160 psi), and a
temperature exceeding 121 degrees C (250 degrees F).

,d) any one or more boilers containing liquid and having a working pressure
exceeding 1,200 kPa (160 psi), and a temperature not exceeding 121 degrees C
(250 degrees F).
e) any one or more boilers containing liquid and having a working pressure not
exceeding 1,100 kPa (160 psi), and a temperature exceeding 121 degrees C (250
degrees F).
a) any one or more boilers in which steam or other vapour is generated at more than
103 kPa (15 psi).
Power engineers are
a) safety code officers in a power plant automatically.
b) qualified to perform any welding jobs in a power plant.
c) skilled workers who operate and maintain the equipment in a power plant.
d) qualified to perform any electrical jobs in a power plant.
e) qualified to make design changes in a power plant.
c) skilled workers who operate and maintain the equipment in a power plant.
In the early days, owners of power plants hired __________
workers, who started out doing manual labour and through acquired experience
they were promoted to jobs with gradually increasing levels of skill.

a) qualified
b) highly educated
c) trained
d) unskilled
e) college trained
d) unskilled
In order to produce greater efficiency, higher boiler
pressures were used and this led to __________ due to
employing of unqualified operators in a power plant.

a) economic gains
b) serious accidents
c) higher efficiency
d) safer working conditions
e) less labour disputes
b) serious accidents
Which of the following is not a common work schedule for power engineers?

a) Year round employment
b) Seasonal lay-offs
c) Eight hour days
d) Twelve hour days
e) Rotating day and night shifts
b) Seasonal lay-offs
When oil mixes with water in the boiler the resultant effect is:

a) serious foaming

,b) accumulation of very hard scale resulting in tube burnout
c) accumulation of soot
d) decrease in water level
e) shifting and loosening of baffles
a) serious foaming
The holder of a Certificate of Competency, the classification of which authorizes
him or her to act as a engineer, may sketch, construct, install, operate, repair, and
give advice on all things pertaining to any __________ in which that person is
employed.

a) welding shop
b) automotive shop
c) power plant
d) fish plant
e) hydro plant
c) power plant
Power engineers can usually expect to work

a) straight 8 hour day shifts.
b) straight 12 hour day shifts.
c) straight 8 hour night shifts.
d) straight 12 hour night shifts.
e) rotating shifts.
e) rotating shifts.
In a power plant, the power engineer may function as a supervisor who directs
others in the __________ operation on a shift.

a) simple and economical
b) welding and electrical
c) administrative and cooperative
d) production and receiving
e) safe and efficient
e) safe and efficient
Committees which establish standards are composed primarily of which of the
following elements?
a) only experts from the industry and government
b) one government appointed standards board
c) experts from the industry, professional and insurance groups and all levels of
government
d) only multi-National power corporations
e) one independent safety and standardisation board
c) experts from the industry, professional and insurance groups and all levels of
government
Which of the following certificates of competency qualifies the holder to take
charge of the general care and operation of any power plant as chief steam

, engineer, and to supervise the engineers in that plant and take charge of a shift in
any power plant as shift engineer?
a) Third Class Engineer's Certificate of Competency
b) Building Operator's Certificate of Competency
c) Pressure Welder's Certificate of Competency
d) First Class Engineer's Certificate of Competency
e) Fireman's Certificate of Competency
d) First Class Engineer's Certificate of Competency
Which of the following duties is a holder of a Fourth Class Engineer's Certificate
of Competency not qualified to perform?
a) Take charge of a shift in a power plant having a capacity of more than 10,000
kW, as shift engineer.
b) Take charge of the general care and operation of a power
plant consisting of one or more coil type drumless boilers having an aggregate
capacity not over 5,000 kW, when only in use for the purpose of subterranean
thermal flooding in oil fields, as chief engineer.
c) Take charge of the general care and operation of a power plant having a
capacity of not more than 1,000 kW as chief steam engineer, and to supervise the
engineers in that plant.
d) Take charge of a shift in a power plant consisting of one or more coil type
drumless boilers having an aggregate capacity of not more than 10,000 kW, when
used only for underground thermal flooding in oil fields, as shift engineer.
e) Take charge of a shift in a power plant having a capacity of not more than 5,000
kW, as shift engineer.
a) Take charge of a shift in a power plant having a capacity of more than 10,000 kW, as
shift engineer.
Which of the following is required in order to progress to a
higher certificate?

a) Experience only
b) Education only
c) Hold the next lower level certificate only
d) Both education and the next lower level certificate
e) Education, experience, and the next lower level
certificate.
e) Education, experience, and the next lower level
The IAO is an organisation who's primary concern is:
a) lowering of maintenance costs through standardisation
b) lowering of production costs through increased automation
c) increase in safety awareness through public education
d) lowering of insurance costs through standardisation
e) increase in equipment quality through tougher government
regulation
d) lowering of insurance costs through standardisation
In the early days, the following two agencies got involved in
the certification of both power plant operators and equipment

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller QUICKEXAMINER. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $21.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$21.49
  • (0)
  Add to cart