NASCLA GC Exam (Questions and A nswers)
NASCLA GC Exam (Questions and A nswers) precast floor panel jacking - CORRECT ANSWER-removed when grout has hardened corbel - CORRECT ANSWER-used to support structural beams concrete panels - CORRECT ANSWER-help with rapid construction lift wall panels - CORRECT ANSWER-at edges dunnage continuous - CORRECT ANSWER-only for one stack value engineering - CORRECT ANSWER-only during design phase superintendent - CORRECT ANSWER-is responsible for "as built" drawings shop drawings - CORRECT ANSWER-fabricator or manufacturer CPM - CORRECT ANSWER-start work at different times but finish at the same time laydown - CORRECT ANSWER-area used to store materials keep approved submittals - CORRECT ANSWER-on the job site submittals - CORRECT ANSWER-impact schedule addendum - CORRECT ANSWER-during bid/before contract change order - CORRECT ANSWER-after contract owner is responsible - CORRECT ANSWER-for making sure site is ready to build PM is unlikely to work with - CORRECT ANSWER-"as built" drawings NFPA Pamphlet 72 - CORRECT ANSWER-audible requirements for smoke detectors stair risers - CORRECT ANSWER-4" min/7" max ramps with rise greater than 6" must have - CORRECT ANSWER-handrail grab bars in shower - CORRECT ANSWER-33-36"
Written for
- Institution
- NASCLA
- Module
- NASCLA
Document information
- Uploaded on
- March 14, 2024
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- control contraction
-
nascla gc exam questions and a nswers
-
precast floor panel jacking
-
ramps with rise greater than 6 must have