API 1169. study test questions test RM#1 with correct answers top graded 2024
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. - Equal According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. - 4.5 This legislation covers hazardous substance, site contamination, and cleanup - Comprehensive environmental recovery, compensation, and liability act. A blueprint showing the exact route of a pipeline and virtually all of the knowledge that exist for that pipeline when constructed is called a ______________? - Alignment sheets In area is considered oxygen deficient if the oxygen level is below ___________ % - 19.5 During a pressure test, if a leak develops on a connection, yomust depressurize to a safe level and then - re-tighten the connections Which listed non-destructive testing method is specified in API 1104? - RT examination Prior to a hydrotest, ensure that the _______ has approved the de-watering location. - Environmental Inspector As an inspector, you should ensure that there is always a (n) on a site with an open excavation. - designated competent person Calculate the top width of a bell hole excavation using the following information: Depth of ditch: 8 feet Bottom Width: feet Soil type: C - 30 : formula soil type C : 3 x depth + bottom width = top width Demonstrated ability to apply knowledge and skills. - competence According to the EPA, which phase covers containment, countermeasures, cleanup, and disposal for response for oil removal after a spill. - Phase III Which refarence in 40 CFR Part 300 claifies procedures for planning and implementing off-site response actions for hazardous substances? - 300.440 The color code for marking oil & gas buried utilities during sweep is _____________? - yellow According to OSHA, excavations that are less than 5' in depth & the examination of the ground by a competent person provides no indication of a potential cave-in, is not required to have any type of protection system. - True MOC stands for ____________? - management of change Replica tape is used during __________ measurements? - surface profile Where can the exact code for strength test requirements be found for carbon steel (natural gas) pipelines to operate at a hoop stress of 30% or more of SMYS? - 192.505 Title 49, CFR 195: The total number of girth welds and the number nondestructively tested, including the number rejected and the disposition of each rejected weld records must be maintained for at least - 5 years According to Title 49, CFR 192, Subpart N: Records of prior qualification and records of individuals no longer performing covered tasks shall be retained for a period of ______________ years. - 5 During weld qualification, the fillet weld specimens can be broken inside the weld by any convenient method. - true The excavation tolerance zone is __________from center-line of proposed excavation. The excavation. - 24 inchs Typically, the test pressure ratio is 1.25 and the duration is 4 hours or longer during __________? - strength test In recards to hazardous liquids pipelines, what is the API RP that must be followed in order to use pipe transported via railroad if it has an OD to WT ratio of 75 to 1 and that will be operated at a hoop stress of 25% of SMYS? - API RP SL1 According to OSHA, what is the maximum amount of Category 4 flammable liquids that may be stored in any one Storage cabinet? - 120 gallons The encroachment area is an area within ________________ of the existing facilities, or the distant mandated by state law where applicable, which ever is greater. - 50 feet The three main systems of pipelines according to PHMSA are - Transmission, gathering, and distribution Due Diligence Corridor is distance equal to the width of the proposed survey corridor plus ___________ feet on each side for Crossings Construction involving survey corridor. - 50
Geschreven voor
- Instelling
- API 1169
- Vak
- API 1169
Documentinformatie
- Geüpload op
- 17 maart 2024
- Aantal pagina's
- 11
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
- api 1169 study test
- api 1169
-
api 1169 study test questions test rm1
-
api 1169 study test questions test
Ook beschikbaar in voordeelbundel