According to the N.C. Structural Pest Control Rules and Regulations written agreements
for termite treatments must include a foundation diagram of the structure to be treated.
Which of the following information is not required to be shown on this diagram?
Correct Answer: The linear footage of the foundation walls.
Under N.C. Rules governing termite treatments, when you horizontally drill an earth-
filled slab porch, the first hole is drilled.
Correct Answer: 16 inches below the bottom of the slab.
Carpenter bees overwinter as
Correct Answer: adults
If your pump dispenses 1 gallon of termiticide in 25 seconds, what is your flow rate (in
gallons per minute)?
Correct Answer: 2.4 gallons per minute 25/60= 2.4
Lyctid powderpost beetles feed primarily on the
, Correct Answer: sapwood in hardwoods
When treating dirt filled porches; drill vertically through the slab no more
than____________ from the foundation wall at ______________.
Correct Answer: 6 inches; 12 inch
Blue-stain fungi are often associated with _______
Correct Answer: Ambrosia beetles
According to the N.C. Rules governing termite pretreatments, a horizontal barrier is not
needed for soil that will be covered by a walkway if
Correct Answer: the walkway is less than three feet wide
On current termiticide labels, the minimum depths for soil treatment
Correct Answer: is 4 feet or the top of the footer, or whichever is less
Under which situation are you not required to trench the soil along the outside
foundation wall before treating the soil?
Correct Answer: The statement is false, you must always trench the soil along the
outside foundation wall before treating the soil.
Baiting systems used for pre-construction treatments must be installed
Correct Answer: after final grading