ARE 5.0 - Construction & Evaluation Test with 100% Correct | Latest Updated Graded A+
Competitive bid - Can be public or private and involves more than 1 contractor Negotiated Bid - For privately funded projects, Owner and Architect work with 1 GC to reach a price Why would an Owner hire a Construction Manager as Adviser (CMa)? - To assist in project delivery by providing cost estimating, scheduling, and construction contract management services to the Owner Which project delivery limits the role and responsibilities of the Architect during preconstruction? - IPD Who is responsible for cost control in design-build delivery? - The GC (Architect is responsible for controlling cost of design services) Who must approve a proposed substitution? If approved, what is done with the proposal? - Architect. If approved, it becomes an addendum to be included in the bid documents Who is the only party who guarantees by contract all construction costs? - GCAt a public hearing, which two items are announced by the Architect after each bid is opened? - - Bid amount - Whether bidder has submitted the required supporting documentation According to B101 (O+A), what form of dispute resolution must be tried before arbitration? - Mediation What other construction delivery method is most similar to the Construction Manager as Constructor (CMc) with regard to the many roles and responsibilities of the Architect? - Design-Bid-Build During agency review, what is the Architect's role in an IPD project? - Working with AHJ to show code compliance related to the BIM model What is the purpose of the Architect's site observation? - - Becoming generally familiar w/ progress and quality of the work & to keep Owner informed - Endeavoring to guard Owner against defects and deficiencies in the work - Determining if the work is progressing in such a way that it will be in accordance w/ CDs when completed What is the Architect not responsible for during the construction of the project? - - Exhaustive or continuous on-site inspections - Means and methods of construction - Site safety
Written for
- Institution
- ARE 5.0 - Construction & Evaluation
- Course
- ARE 5.0 - Construction & Evaluation
Document information
- Uploaded on
- March 23, 2024
- Number of pages
- 34
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
are 50 construction evaluation test with 100