100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CLC 222 Module 3 Exam: Contract Management

Beoordeling
-
Verkocht
-
Pagina's
2
Cijfer
A+
Geüpload op
06-04-2024
Geschreven in
2023/2024

CLC 222 Module 3 Exam: Contract Management • When reviewing the contract, which of the following shall be reviewed for technical and contractual understanding? (Select all that apply) o Incorrect: The Statement of Work • If the COR is monitoring the contract and notices that most of the deliverables are late, this could be an indicator of a problem with the contractor's ability to perform the contract. o Correct: True • A bilateral modification is used to. o Correct: All of these answers are correct • When changes are made to a contract, the government must determine if the change is within ?scope.? In plain English that means the work falls under the basic intent of the original contract. o Correct: True • The COR should work with the Contracting Officer if the COR identifies a need to change the current contract. o Correct: True • During negotiations for a proposed change to the contract, the COR may be asked to: o Correct: All these responses are correct • When a contractor performs work beyond that required by the contract without a formal change order and it is perceived that such work was ordered by the Government or caused by Government fault, this is defined as? o Correct: Constructive change • An unauthorized commitment is caused by government personnel obligating the government without contract authority. o Correct: True • The COR should be familiar with all the following areas of a contract: o Correct: All these statements are correct • Accounting data is entered at the CLIN level with ACRNS as shorthand for tracking LOAs. o Correct: True • The main purpose for the COR to understand the contract and how it is organized is to be aware of all contractual requirements and deliverables. This knowledge helps the COR track contractor performance and ensure contractor compliance with the contract as written. o Correct: True • One of the main responsibilities of the COR in modifying the contract is to provide the Contracting Officer with complete documentation on the contract and events that led to the modification. o Correct: True • The program manager for the transportation directorate requested that the COR submit a request to change the contract. The change is an increase in quantity of 1000 truck tires costing $225 each, under a fixed price tire contract for 500 tires. Choose the best answer regarding the scope of this requirement. o Correct: This increase may not be within the scope of the tire contract.

Meer zien Lees minder
Instelling
CLC 222 Module 3 Contract Management
Vak
CLC 222 Module 3 Contract Management








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CLC 222 Module 3 Contract Management
Vak
CLC 222 Module 3 Contract Management

Documentinformatie

Geüpload op
6 april 2024
Aantal pagina's
2
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MYSOLUTIONS NURSING
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
22
Lid sinds
1 jaar
Aantal volgers
7
Documenten
1796
Laatst verkocht
1 dag geleden
MYSOLUTIONS

I have solutions for the following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology, and all other subjects Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you don\'t not agree with my solutions I am ready for a refund.

4.0

2 beoordelingen

5
1
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen