Termination - TIM TRAINING Questions and Answers Graded A+
Termination - TIM TRAINING Questions and Answers Graded A+ 1. What is the last task in the termination phase of a roadway incident? A) Terminating command B) Removal of traffic control and blocking vehicles C) Ensuring that all incident documentation is complete D) Confirming that all personnel and equipment are accounted for B) Removal of traffic control and blocking vehicles What is typically the next step after the immediate emergency response phase, such as patient care or vehicle fire extinguishment, has concluded? A) Terminate command B) Create a termination plan C) Stow fire, rescue, and EMS equipment D) Perform a personnel accountability check B) Create a termination plan Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:00 / 0:15 Full screen Which one of the following is not part of the roadway incident termination plan? A) Removal of detours B) Repair of the roadway C) Incident documentation D) Notification of the Traffic Management Center C) Incident documentation ***NOT SURE+++ Once all tasks are complete and you are ready to reopen the road or lane, you may dismantle the scene. What is the correct manner in which to accomplish this task? A) From the Advance Warning Area forward to the Activity Area B) From the Termination Area backward to the Activity Area C) From the Termination Area forward to the Advance Warning Area D) From the Termination Area backward to the Advance Warning Area D) From the Termination Area backward to the Advance Warning Area Deploy emergency vehicles __________ as advance warning and blocking when temporary traffic control devices are being removed and/or when equipment is being demobilized. A) special B) parallel C) upstream D) downstream C) upstream What is the first key to smooth roadway operations involving towing and recovery? A) Conduct joint training B) Preplan prior to the incident C) Make a timely call for the towing company and provide accurate information D) Know and adhere to the regulations and SOPs with regard to removal and towing and recovery zxc Make a timely call for the towing company and provide accurate information. Although you should know the TRAA Vehicle Identification Guide and use proper terminology, resist the urge to: A) maintain blocking functions B) stow firefighting tools and equipment C) remove small debris from the roadway D) specify the type of towing response vehicle needed D) specify the type of towing response vehicle needed How should the vehicles remaining at the roadway incident scene depart once traffic control removal has been completed? A) Depart at same time B) Depart upstream first, if possible C) Depart in the same order that they arrived D) Depart downstream first, if possible D) Depart downstream first, if possible What is the last thing that should be done at a roadway incident scene? Write the incident report B) Towing and recovery C) Perform a critique of the operation D) Remove all damaged vehicles from the roadway zxc Whose role is to remove vehicles involved in the incident quickly and safely so the roadway can be reopened as soon as possible? A) Law enforcement B) Towing and recovery C) Incident commander D) Highway department B) Towing and recovery Safe, quick clearance of highway emergency scenes is a cornerstone of the: "National Unified Goal for Traffic Incident Management". What policy or system gives designated public agencies permission to remove vehicles and/or spilled cargo from the roadway to restore traffic flow? An Authority Removal Law
Written for
- Institution
- TIMS
- Course
- TIMS
Document information
- Uploaded on
- April 8, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
termination tim training questions and answers g
-
1 what is the last task in the termination phase
-
what is typically the next step after the immediat
-
which one of the following is not part of the roa
Also available in package deal