100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NORAC STUDY GUIDE 180 QUESTIONS AND ANSWERS 2024 $17.99   Add to cart

Exam (elaborations)

NORAC STUDY GUIDE 180 QUESTIONS AND ANSWERS 2024

 1 view  0 purchase
  • Course
  • NORAC
  • Institution
  • NORAC

NORAC STUDY GUIDE 180 QUESTIONS AND ANSWERS 2024

Preview 4 out of 78  pages

  • April 12, 2024
  • 78
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • NORAC
  • NORAC
avatar-seller
ExpertMourine
NORAC STUDY GUIDE 180 QUESTIONS
AND ANSWERS 2024
1. What is the block signal system called in which the use of each

block is governed by an automatic block signal, cab signal or both?:
Automatic Block Signal System (ABS)
[NORAC p.1]
2. What is the term for an uncoupled engine (or engines) or the

leading portion of a train that is directed back toward the
remaining stationary portion of the same train?: Return Movement
[NORAC p.6]
3. Why type of signal is used to govern the approach to a home

signal?: Distant Signal
[NORAC p.3]
4. The signal that governs the entrance to an interlocking is called

what?: Home Signal [NORAC p.4]
5. What is the name of a track that is designated by timetable upon

which movements are authorized by ABS, DCS or interlocking
rules?: Main Track
[NORAC p.5]




,6. What publication is used to inform employees of information

affecting the movement of trains?: Bulletin Order (BO)
[NORAC p.1]
7. What publication is used to summarize changes to the timetable

and other instruction manuals?: General Order (GO)
[NORAC p.4]
8. What publication is published periodically which contains

instruction and information that does not affect the movement of
trains?: Division Notice (DN) [NORAC p.3]
9. What is the Stop Release function?: An operation of the PTC system

which allows equipment to be released from a positive stop. [NORAC
p.7]
10. What is a Positive Train Control System (PTC)?: An electronic train

control system which enforces Normal Speed, Temporary Speed
Restrictions, Stop Signals, or other conditions requiring a train stop.
[NORAC p.6]
11. What is a Data Radio?: A radio used on PTC equipped trains and

fixed sites to send and receive PTC data updates and information.
[NORAC p.2]






,12. What is a Transponder?: A device mounted between the rails that

transmits location specific information to trains equipped with on
board PTC apparatus. [NORAC p.8]
13. What is the speed that does not exceed 15MPH?: Slow Speed

[NORAC p.7]
14. What is the speed that does not exceed 30MPH?: Medium Speed

[NORAC p.7]
15. What is the speed that does not exceed 45MPH for passenger trains

and 40MPH for freight trains?: Limited Speed
[NORAC p.7]
16. What is the term used for Maximum Authorized Speed?: Normal

Speed
[NORAC p.7]
17. What is the fouling point?: The point on a track beyond which

equipment will foul an adjacent track. Fouling points will not safely
accommodate a person riding the side of a car. [NORAC p.4]
18. Whom should an employee consult if in doubt as to the meaning or

application of a rule or special instruction?: Employees must be
familiar with and obey all rules and special instructions that relate to
their duties. If in doubt as to the meaning or application of a rule or



, special instruction, an employee must request an explanation from
the proper authority.
[NORAC Rule B, p.9]
19. What required books must employees maintain and have with

them on duty?: The operating rules and timetable, if their duties are
affected by them.

The safety rules for their department.

The Hazardous Materials Instructions, if they are involved in the
shipment of hazardous materials.

The Air Brake Instructions, if their duties are affected by them.
[NORAC Rule A, p.9]
20. When must a train crew notify the train dispatcher before the

expiration of their legal on duty period?: Train and engine crews
must notify the appropriate Train Dispatcher or other designated
supervisor not less than 3 hours before the expiration of their legal
on-duty period, unless scheduled to complete their assignment before
their legal work period expires.
[NORAC Rule Q, p.14]

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ExpertMourine. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
$17.99
  • (0)
  Buy now