EQUIPMENT PREPARATION COURSE PHASE 1 EXAM 2024
EQUIPMENT PREPARATION COURSE PHASE 1 EXAM 2024 A/DACG - correct answer A provisional organization designed to assist AMC and the deploying unit in receiving, processing, and loading or unloading personnel and equipment. AERIAL PORT - correct answer An airfield that has been designated for sustained air movement of personnel and material. AIR TERMINAL - correct answer A facility on an airfield that functions as an air transportation hub and accommodates the loading and unloading of airlift aircraft. CRE - correct answer A deployable individual unit that performs specific functions required to support airlift operations. INSTALLATION DEPLOYMENT FORCED - correct answer All installation support elements that assist through the different stages of the deployment process. CRT - correct answer Performs the same functions as a CRE, but on a smaller scale. It is capable of supporting operations for 12 hours a day but will maintain 24-hour command and control (C2) coverage. THE SUPPORTED COMMANDER - correct answer Establishes the priority and sequence for the deployment of personnel, equipment, and supplies, and coordinates the development of the deployment plan with all organizations. 75% - correct answer The 463L system is extremely reliable and can reduce ground times by as much as _____________. KC-135 - correct answer The dual rail system is permanently installed in all Air Mobility Command cargo capabl
Written for
- Institution
- EQUIPMENT PREPARATION
- Course
- EQUIPMENT PREPARATION
Document information
- Uploaded on
- April 23, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
equipment preparation course phase 1 exam 2024