Exam (elaborations)
Advanced Rigging Practice Test Best Study Material
- Course
- Institution
the operational quadrant between the left-or-right-side outriggers is - CORRECT ANSWER-over-the-side cranes are typically built to be - CORRECT ANSWER-longer than they are wide in a multiple-crane lift, the crane with the greatest net capacity must always be - CORRECT ANSWER-closest to the loa...
[Show more]