CDT Practice Exam Final questions and answers A-graded
CDT Practice Exam Final questions and answers A-graded Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - CORRECT ANSWER-Answer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usually bound with other written construction documents into a project manual. Before a model building code can become the building code for a jurisdiction, it has to be adopted by? (A) Authority Having Jurisdiction (B) State Government (C) Building Inspector (D) International Organization for Standardization - CORRECT ANSWER-Answer: A Reference: PDPG 4.3 Explanation: Before a model building code can become the building code for a jurisdiction, it has to be adopted by that AHJ. Once adopted, they then are responsible for enforcing that building code within their jurisdiction. The Construction Manager is hired by this entity? (A) The General contractor (B) Owner (C) A/E (D) Contract Administrator - CORRECT ANSWER-Answer: B Reference: PDPG 2.6.4 Explanation: The owner usually engages the services of a construction manager, an entity that typically contracts with the owner to provide construction management services. The parties to the Construction Agreement are?
École, étude et sujet
- Établissement
- CDT
- Cours
- CDT
Infos sur le Document
- Publié le
- 5 mai 2024
- Nombre de pages
- 29
- Écrit en
- 2023/2024
- Type
- Examen
- Contenu
- Questions et réponses
Sujets
-
cdt practice exam final questions and answers a g
-
which of these documents might we find in the pro
-
the requirements of the general conditions can be
-
defined as the written and graphic documents prep