100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
FLORIDA FIRE INSPECTOR REVIEW QUESTIONS & ANSWERS, GRADED A+| latest update 2024/25| $9.99   Add to cart

Exam (elaborations)

FLORIDA FIRE INSPECTOR REVIEW QUESTIONS & ANSWERS, GRADED A+| latest update 2024/25|

 9 views  0 purchase
  • Course
  • FLORIDA FIRE INSPECTOR
  • Institution
  • FLORIDA FIRE INSPECTOR

FLORIDA FIRE INSPECTOR REVIEW QUESTIONS & ANSWERS, GRADED A+ passive - -Fire rated walls are examples of _____ fire protection features. used to clarify assembly - -What is an exploded Pictorial Drawing? pressure - -One unavoidable problem with standpipe systems is the variation of ____ with bu...

[Show more]

Preview 4 out of 44  pages

  • May 9, 2024
  • 44
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • FLORIDA FIRE INSPECTOR
  • FLORIDA FIRE INSPECTOR
avatar-seller
Terryl
1 FLORIDA FIRE INSPECTOR REVIEW QUESTIONS & ANSWERS , GRADED A+ passive - ✅✅ -Fire rated walls are examples of _____ fire protection features. used to clarify assembly - ✅✅ -What is an exploded Pictorial Drawing? pressure - ✅✅ -One unavoidable problem with standpipe systems is the variation of ____ with building heigh t. descriptive codes - ✅✅ -Traditional fire and building codes are called? a steep slope - ✅✅ -Contour line that are close together on a plan indicate _______? 300 ft - ✅✅ -At what height can water be effectively pumped from the ground level with adequate pressure? architects signature - ✅✅ -A set of architectural drawings must contain a __________ to be considered a valid set of plans. code - ✅✅ -A _______ is a collection or body of rules pertaining to one subject area such as buildings, fires, and motor v ehicles. >180 days - ✅✅ -Fire codes typically address membrane structures with a life of how many days? in the welding schedule - ✅✅ -Where are the notes placed for a welding symbol? spec buildings - ✅✅ -Buildings constructed without final occupancy in min d are called? plot - ✅✅ -A ________ plans shows the overall project layout including features such as building areas, location, setbacks, etc. as-built plans - ✅✅ -What term is used to define the final set of plans or drawings that are saved as a permanent record? hydraulic - ✅✅ -Contemporary Sprinkler systems are designed using ____________ calculations. mechanical - ✅✅ -What type of plan would a HVAC system be shown? Device designed to limit the standpipe pressure for 2 1/2 inch outlets when the pressure exceeds 175 PSI - ✅✅ -What is the purpose of a PRV? run - ✅✅ -Wiring is sometime referred to as a? 1 hour - ✅✅ -It is common for codes to require a __________ fire -resistive rating for corridor walls in health care facilities. concentrated load - ✅✅ -Any l oad that is applied at one point or over a small area such as a safe or heavy piece of equipment is considered a true - ✅✅ -True or Flase, Fire and emergency service plans examiner may not be involved in the review of structural plans. light hazard - ✅✅ -What type of occupancy is considered those in which the quantity or combustibility of the contents is low and heat -release rates expected are also low? load - ✅✅ -Any effect that a structure must be designed to prevent is best described as a ________? mech anical - ✅✅ -_________ plans show where plumbing systems and heating, ventilation and air conditioning systems. footing - ✅✅ -The purpose of the ___________ beneath the foundation is to distribute the buildings weight? torsional - ✅✅ -What type of force is produced in a structural member when it is twisted, creating shear stresses in the material? direct pressure load - ✅✅ -What type of load would the impact of wind against a buildings wall is known as? addressable - ✅✅ -An alarm system where each part of th e system has its own unique address and talks to the main control panel is known as? 75ft - ✅✅ -What is the maximum travel distance from any point in a structure to an extinguisher location? pictorial/rendering - ✅✅ -What type of drawing provides the most realistic view of how equipment looks as well as how it is connected? 5 min - ✅✅ -Fire alarms are required to have emergency power systems that may consist of storage batteries or a combination of an emergency generator and storage batteries. When an emerg ency generator is used, storage batteries capable of supplying the fire alarm system for? risers - ✅✅ -_____ is a term generally applied to vertical supply pipes used to supply water to the upper floors. stairwells - ✅✅ -Class 1 standpipe connections must be located in what part of the building? grounding - ✅✅ -What is the term used to describe equalizing static electrical charge between an object and the earth? annunciator panel - ✅✅ -An _____________ indicates where an alarm or other condition has origina ted on the fire alarm system. class 2 - ✅✅ -What class of standpipe is designed for use by either fire department personnel or building occupants? 100psi - ✅✅ -NFPA 14 requires a minimum residual pressure of ________ PSI at the most remote 2 1/2 " hose val ve for Class I and Class III standpipes. bonding - ✅✅ -What term is used to describe equalizing static electrical charges between two object such as a drum and container? 25ft - ✅✅ -Modern elevators that rise more than __________ feet are required to be eq uipped with a key operated manual recall or fireman's service systems. 175psi - ✅✅ -PRV devices typically limit the system pressure to a maximum of ________ to prevent damage to the system. 2 hours or 50ft from the building - ✅✅ -In high -rise structures, w hat is the minimum fire protection rating/separation for an indoor stationary fire -pump? 3% - ✅✅ -Gauges not accurate to within ____ of the full scale shall be recalibrated or replaced. datum - ✅✅ -A method to indicate the elevation of carious building fea tures above an established reference point is normally called a ______? protect community health & safety - ✅✅ -The most fundamental reason for requiring construction permits is? backflow prevention - ✅✅ -___________ on water supplies to fire protection sy stems is required to prevent potential contamination of domestic water by cross -connection to a non -domestic source.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Terryl. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart