Sprinkler Chart Questions (S12) 100% correct answers.
How often shall the stem of an OS&Y Valve be lubricated correct answers Annually The 3 year dry pipe trip test is to be performed by whom? correct answers MP & MFSPC Fire department connections are to be inspected how often? correct answers Quarterly Water motor gongs are to be tested how often? correct answers Quarterly In a water spray fixed system inspection if the strainer is found corroded what color tag is required? correct answers Yellow A sprinkler head with a red frame has a temperature classification of? correct answers Extra High (325 - 375°F) The Hydraulic name plate shall be inspected how often? correct answers Quarterly What color tag is required when sprinkler heads are found to be lightly corroded? correct answers Orange Obstructions in sprinkler systems shall be investigated how often? correct answers 5 Years What color tag is required when the circuit breakers on a special service pump are over 2 years old? correct answers Orange What color tag is required when sprinkler heads made prior to 1920 have not been replaced? correct answers Orange, notify FDNY after 30 days During an operational test of a foam water sprinkler system, if the nozzles are plugged what color tag is used? correct answers Red Steel water storage tanks without corrosive protection are to be inspected how often? correct answers 3 years A sprinkler head with a white frame has a temperature rating of? correct answers 175 - 225°F The weekly test of an electric fire pump is how long? correct answers 10 minutes The weekly test of a Diesel fire pump is how long? correct answers 30 minutes Upon inspection of a sprinkler system, if the hydraulic nameplate is missing what color tag is used? correct answers Yellow When inspecting a preaction system, if the electrical components are not in service what color tag is used? correct answers Red Vane type water flow devices shall be tested how often? correct answers Semi-annually
Written for
- Institution
- S12 / S13 Sprinkler Standpipe
- Course
- S12 / S13 Sprinkler Standpipe
Document information
- Uploaded on
- May 28, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
how often shall the stem of an osy valve be lubri
Also available in package deal